濟(jì)南電纜橋架安裝施工要求及規(guī)范

  電纜橋架在我國(guó)的應(yīng)用只有十多年,在歐美發(fā)達(dá)也不過是幾十年。在一個(gè)機(jī)房項(xiàng)目中,比起造價(jià)昂貴、高科技的硬件和軟件,橋架顯的很不起眼,也很少為人關(guān)注,但它卻也是整個(gè)布線工程中不可缺少的部分。那么在施工中電纜橋架安裝施工要求及規(guī)范怎么樣?

  The application of cable trays in China has only been more than ten years, and in developed countries in Europe and America, it is only a few decades. In a computer room project, compared to expensive and high-tech hardware and software, cable trays may appear inconspicuous and receive little attention, but they are still an indispensable part of the entire cabling project. So what are the requirements and standards for the installation of cable trays during construction?base64_image

  1 一般規(guī)定  1.1本章適用于電壓為10KV及以下新建擴(kuò)建的一般工業(yè)與民用建筑電纜、橋架安裝和橋架內(nèi)電纜敷設(shè)

  1 General Provisions 1.1 This chapter applies to the installation of cables, cable trays, and cable laying inside cable trays for newly constructed and expanded general industrial and civil buildings with a voltage of 10KV or below

  1.2電纜橋架安裝和橋架內(nèi)電纜敷設(shè),應(yīng)按已批準(zhǔn)的設(shè)計(jì)文件施工。

  1.2 The installation of cable trays and the laying of cables inside the trays shall be carried out in accordance with the approved design documents.

  1.3由支、吊、托架支撐的托盤(槽)或梯架直線段、彎通非直線段組合而成,敷設(shè)電纜具有連續(xù)性的剛性結(jié)構(gòu)系統(tǒng),為電纜橋架。見圖1.3

  1.3 A rigid structural system consisting of trays (troughs) or ladder straight sections and curved non straight sections supported by supports, hangers, and brackets, with continuous cable laying, is called a cable tray. Refer to Figure 1.3

  1.4 金屬電纜橋架及其支架和引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)定:

  1.4 Metal cable trays and their supports, as well as metal cable conduits introduced or led out, must be reliably grounded (PE) or grounded (PEN), and must comply with the following regulations:

  1.4.1金屬電纜橋架及支架全長(zhǎng)應(yīng)不少于2處與接地(PE)或接零(PEN)干線相連接;

  1.4.1 The total length of metal cable trays and supports should be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points;

  1.4.2非鍍鋅電纜橋架間連接板的兩端跨接線銅芯接地線,接地線小允許截面積不小于4mm2;

  1.4.2 Copper core grounding wire for the two ends of the connecting plate between non galvanized cable trays, with a minimum allowable cross-sectional area of not less than 4mm2 for the grounding wire;

  1.4.3鍍鋅電纜橋架間連接板的兩端不跨接接地線,但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  1.4.3 The two ends of the connecting plate between galvanized cable trays shall not be connected to the grounding wire, but there shall be no less than 2 connection fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  1.4.5電纜敷設(shè)嚴(yán)禁有絞擰、鎧裝壓扁、護(hù)層斷裂和表面嚴(yán)重劃傷等缺陷。

  1.4.5 Cable laying must strictly prohibit defects such as twisting, flattening of armor, breakage of protective layer, and severe surface scratches.

  1.4.6電纜橋架處如有防火要求的場(chǎng)所,應(yīng)采取防火隔離措施。

  If there are fire prevention requirements at the cable tray location, fire isolation measures should be taken.

  2 施工準(zhǔn)備

  2. Construction preparation

  2.1 技術(shù)準(zhǔn)備:

  2.1 Technical Preparation:

  2.1.1按照已批準(zhǔn)的施工組織設(shè)計(jì)(施工方案)進(jìn)行技術(shù)、交底。

  2.1.1 Conduct technical and safety briefings in accordance with the approved construction organization design (construction plan).

  2.1.2 施工執(zhí)行工藝標(biāo)準(zhǔn)、圖集、規(guī)范齊全。

  2.1.2 The construction execution process standards, drawings, and specifications are complete.

  2.1.3電纜橋架敷設(shè)前,應(yīng)檢查橋架敷設(shè)有無與其他設(shè)備、管線交叉或重疊無法施工的地方,施工前應(yīng)與各工種、監(jiān)理或建設(shè)單位及設(shè)計(jì)單位協(xié)商好,并作好記錄,以保證施工順利進(jìn)行。

  Before laying cable trays, it is necessary to check whether there are any areas where the tray crosses or overlaps with other equipment or pipelines that cannot be constructed. Prior to construction, it is necessary to consult with various trades, supervisors, construction units, and design units, and make records to ensure smooth construction.

  2.1.4根據(jù)施工圖或施工所用電纜應(yīng)作好電纜牽引力的計(jì)算。

  2.1.4 According to the construction drawings or the cables used for construction, the calculation of cable traction force should be carried out.

  1.電纜橋架規(guī)格及型號(hào)必須符合設(shè)計(jì)要求,附件齊全;橋架與配件、附件和緊固件各種型鋼均應(yīng)采用鍍鋅標(biāo)準(zhǔn)件。

  1. The specifications and models of cable trays must meet the design requirements, and all accessories must be complete; All types of steel for cable trays, accessories, attachments, and fasteners should use galvanized standard parts.

  2.各種規(guī)格電纜橋架的直線段、彎通、橋架附件及支、吊架立柱及型鋼等有產(chǎn)品合格證,橋架內(nèi)外應(yīng)光滑平整,無棱刺,不應(yīng)有扭曲翹邊等變形現(xiàn)象。

  2. The straight sections, bends, accessories, supports, hangers, columns, and steel sections of various specifications of cable trays should have product certification. The inside and outside of the tray should be smooth and flat, without edges or burrs, and there should be no distortion or warping.

  3.橋架訂貨或制作應(yīng)按設(shè)計(jì)要求進(jìn)行,不應(yīng)有誤,應(yīng)反復(fù)校核以免造成浪費(fèi)。

  3. The ordering or production of cable trays should be carried out according to the design requirements, without errors, and should be repeatedly checked to avoid waste.

  4.橋架安裝選擇需屏蔽電氣干擾的電纜回路,有腐蝕的場(chǎng)所、易燃粉塵場(chǎng)所,應(yīng)選用無蓋無孔封閉型托盤,當(dāng)需要因地制宜的場(chǎng)所,宜選用組裝式托盤或有孔托盤及梯架;在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所,宜帶有蓋板。低壓電力電纜與控制電纜共用同一托盤或梯架時(shí),應(yīng)選用中間有隔板的托盤或梯架;在托盤、梯架分支、引上、引下處應(yīng)設(shè)適當(dāng)?shù)膹澩?;因受空間條件限制不便裝設(shè)彎通或有特殊要求時(shí),可選用軟連接板,鉸接板;伸縮縫應(yīng)設(shè)置伸縮板;連接兩段不同寬度或高度的托盤、梯架可配置變寬或變高板。但在施工中,支、吊架和橋架的選擇應(yīng)依設(shè)計(jì)或工程布置條件選擇。

  4. When installing cable trays, cable circuits that need to be shielded from electrical interference should be selected. In places with corrosion and flammable dust, uncovered and non perforated enclosed trays should be used. When suitable for local conditions, assembled trays or perforated trays and ladders should be selected; In environments or outdoor places that are prone to dust accumulation and require cover, it is advisable to have a cover plate. When low-voltage power cables and control cables share the same tray or ladder, a tray or ladder with a partition in the middle should be selected; Appropriate bends should be installed at the branching, leading up, and leading down points of pallets and ladders; When it is not convenient to install bends due to space constraints or there are special requirements, soft connecting plates and hinged plates can be used; Expansion joints should be equipped with expansion plates; Connecting two trays or ladders of different widths or heights can be configured with variable width or height boards. However, during construction, the selection of supports, hangers, and cable trays should be based on the design or engineering layout conditions.

  5.托盤、梯架的寬和高度,應(yīng)按下列要求選擇:

  5. The width and height of pallets and ladders should be selected according to the following requirements:

  (1)電纜在橋架內(nèi)的填充率,電力電纜不應(yīng)大于40%;控制電纜不應(yīng)大于50%。并應(yīng)留有一定的備用空位,以便今后為增添電纜用;

  (1) The filling rate of cables in cable trays should not exceed 40% for power cables; The control cable should not exceed 50%. And there should be some spare space left for future cable additions;

  (2)所選托盤、橋架規(guī)格的承載能力應(yīng)滿足規(guī)定。其工作均布荷載不應(yīng)大于所選托盤、梯架荷載等級(jí)的額定均布荷載;

  (2) The bearing capacity of the selected tray and bridge specifications should meet the requirements. The uniformly distributed load of its work should not exceed the rated uniformly distributed load of the selected pallet and ladder load level;

  (3)工作均布荷載下的相對(duì)撓度不宜大于1/200。

  (3) The relative deflection under uniformly distributed load should not exceed 1/200.

  托盤、梯架直線段,可按單件標(biāo)準(zhǔn)長(zhǎng)度選擇。單件標(biāo)準(zhǔn)長(zhǎng)度一般規(guī)定為2、3、4、6m。托盤、梯架的寬度與高度常用規(guī)格尺寸系列如表2.4-1

  Tray and ladder straight sections can be selected according to the standard length of a single piece. The standard length of a single piece is generally specified as 2, 3, 4, and 6 meters. The commonly used specifications and dimension series for the width and height of pallets and ladders are shown in Table 2.4-1

  注:符號(hào)△表示常用規(guī)格。

  Note: The symbol △ represents commonly used specifications.

  各類彎通及附件規(guī)格,應(yīng)適合工程布置條件,并與托盤、梯架配套。

  All types of bends and accessory specifications should be suitable for the engineering layout conditions and matched with pallets and ladders.

  支、吊架規(guī)格選擇,應(yīng)按托盤、梯架規(guī)格層數(shù)、跨距等條件配置,并應(yīng)滿足荷載的要求。

  The selection of support and hanger specifications should be based on the number of layers, span, and other conditions of the pallet and ladder, and should meet the requirements of the load.

  鋼制橋架的表面處理方式,應(yīng)按工程環(huán)境條件、重要性、耐久性和技術(shù)經(jīng)濟(jì)性等因素進(jìn)行選擇。一般情況宜按表2.4-2選擇適用工程環(huán)境條件的防腐處理方式。當(dāng)采用表中“T”類防腐方式為鍍鋅鎳合金、高純化等其它防腐處理的橋架,應(yīng)按規(guī)定試驗(yàn)驗(yàn)證,并應(yīng)具有明確的技術(shù)質(zhì)量指標(biāo)及檢測(cè)方式。

  The surface treatment method for steel cable trays should be selected based on factors such as engineering environmental conditions, importance, durability, and technical economy. Generally, it is advisable to choose the anti-corrosion treatment method that is suitable for the engineering environmental conditions according to Table 2.4-2. When using the "T" anti-corrosion method in the table, such as galvanized nickel alloy, high-purity or other anti-corrosion treatments, the bridge should be tested and verified according to regulations, and should have clear technical quality indicators and testing methods.

  注:符號(hào)“○”表示防腐類別。

  Note: The symbol "○" indicates the recommended anti-corrosion category.

  6.橋架的外觀檢查

  6. Appearance inspection of bridge frame

  橋架產(chǎn)品包裝箱內(nèi)應(yīng)有裝箱清單、產(chǎn)品合格證及出廠檢驗(yàn)報(bào)告。托盤、梯架板材厚度應(yīng)滿足表2.6的規(guī)定。表面防腐層材料應(yīng)符合現(xiàn)行有關(guān)標(biāo)準(zhǔn)的規(guī)定。

  The packaging box for bridge products should include a packing list, product certification, and factory inspection report. The thickness of pallets and ladder boards should meet the requirements of Table 2.6. The surface anti-corrosion coating material should comply with the relevant national standards currently in effect.

  熱浸鍍鋅的托盤、橋架鍍層表面應(yīng)均勻,無毛刺、過燒、掛灰、傷痕、局部未鍍鋅(直徑2mm以上)等缺陷,不得有影響安裝的鋅瘤。螺紋的鍍層應(yīng)光滑,螺栓連接件應(yīng)能擰入。

  The surface of hot-dip galvanized trays and cable trays should be uniform, without defects such as burrs, overburning, hanging dust, scars, and partial non galvanizing (diameter of 2mm or more), and there should be no zinc nodules that affect installation. The coating of the thread should be smooth, and the bolt connection should be able to be screwed in.

  電鍍鋅的鋅層表面應(yīng)光滑均勻,致密。不得有起皮、氣泡、花斑、局部未鍍、劃傷等缺陷。

  The surface of the zinc layer of electroplated zinc should be smooth, uniform, and dense. There shall be no defects such as peeling, bubbles, flower spots, partial uncoated areas, scratches, etc.

  噴涂應(yīng)平整、光滑、均勻、不起皮、無氣泡水泡。

  The spraying should be smooth, even, without peeling or bubbles.

  橋架焊縫表面均勻,不得有漏焊、裂紋、夾渣、燒穿、弧坑等缺陷。

  The surface of the bridge welding seam should be uniform and free of defects such as missed welding, cracks, slag inclusion, burn through, arc craters, etc.

  橋架螺栓孔徑,在螺桿直徑不大于M16時(shí),可比螺桿直徑大2mm。

  The hole diameter of the bridge bolt can be 2mm larger than the screw diameter when the screw diameter is not greater than M16.

  螺栓連接孔的孔距允許偏差:同一組內(nèi)相鄰兩孔間距±0.7mm,同一組內(nèi)任意兩孔間距±1mm;相鄰兩組的端孔間距±1.2mm。

  The allowable deviation for the distance between bolt connection holes is: the distance between adjacent holes in the same group is ± 0.7mm, the distance between any two holes in the same group is ± 1mm, and the distance between end holes in adjacent groups is ± 1.2mm.

  7.膨脹螺栓:應(yīng)根據(jù)允許拉力和剪力進(jìn)行選擇;可按計(jì)劃驗(yàn)收,絲扣應(yīng)完好無損。

  7. Expansion bolts: should be selected based on allowable tensile and shear forces; The inspection can be carried out according to the plan, and the thread should be intact and undamaged.

  8.電纜應(yīng)有合格證和“CCC”認(rèn)證標(biāo)志,并應(yīng)有“CCC”認(rèn)證復(fù)印件;每盤電纜上應(yīng)標(biāo)明規(guī)格、型號(hào)、電壓等級(jí)、長(zhǎng)度及出廠日期電纜相應(yīng)完好無損。

  8. The cable should have a certificate of conformity and the "CCC" certification mark, and should have a copy of the "CCC" certification; Each cable reel should indicate the specifications, model, voltage level, length, and date of manufacture, and the cable should be intact and undamaged accordingly.

  9.電纜外觀完好無損,鎧裝無銹蝕、無機(jī)械操作,無皺折和扭曲現(xiàn)象。油浸電纜應(yīng)密封良好,無漏油及滲油現(xiàn)象。橡套及塑料電纜外皮及絕緣層無老化及裂紋。電纜端頭密封良好。

  9. The appearance of the cable is intact and undamaged, the armor is not corroded, there is no mechanical operation, and there is no wrinkling or twisting phenomenon. Oil immersed cables should be well sealed without oil leakage or seepage. The rubber sleeve and plastic cable sheath and insulation layer have no aging or cracks. The cable end is well sealed.

  10.其它附屬材料;電纜標(biāo)示牌、油漆、汽油、封鉛、硬脂酸白布帶、橡皮包布、黑包布、塑料絕緣帶等均應(yīng)符合要求

  10. Other ancillary materials; Cable signs, paint, gasoline, lead sealing, stearic acid white cloth tape, rubber wrap, black wrap, plastic insulation tape, etc. should all meet the requirements

  3 施工工藝

  3 Construction Techniques

  3.1 電纜橋架安裝施工工藝

  3.1 Construction process for cable tray installation

  3.1.1電纜橋架安裝工藝流程:

  3.1.1 Cable tray installation process:

  定位放線→預(yù)埋鐵件或膨脹螺栓→支、吊、托架安裝→橋架安裝→保護(hù)接地安裝

  Positioning and laying out → Pre embedded iron parts or expansion bolts → Installation of supports, hangers, and brackets → Installation of cable trays → Installation of protective grounding

  3.1.2根據(jù)施工圖確定始端到終端位置,沿圖紙標(biāo)定走向,找好水平、垂直、彎通,用粉線袋或畫線沿橋架走向在墻壁、頂棚、地面、梁、板、柱等處彈線或畫線,并均勻檔距畫出支、吊、托架位置。

  3.1.2 Determine the starting and ending positions according to the construction drawing, mark the direction along the drawing, find the horizontal, vertical, and curved lines, use a powder line bag or draw lines along the bridge direction to snap or draw lines on walls, ceilings, floors, beams, slabs, columns, etc., and draw the positions of supports, hangers, and brackets evenly spaced.

  3.1.3預(yù)埋鐵件或膨脹螺栓

  3.1.3 Pre embedded iron parts or expansion bolts

  (1) 預(yù)埋鐵件的自制加工不應(yīng)小于120mm×80mm×6mm,做法如本標(biāo)準(zhǔn)6.3.7.2圖6.3.7.2。其錨固圓鋼的直徑不小于10mm。

  (1) The self-made processing of embedded iron parts should not be less than 120mm × 80mm × 6mm, as shown in Figure 6.3.7.2 of this standard. The diameter of the anchored round steel shall not be less than 10mm.

  (2) 緊密配合土建結(jié)構(gòu)的施工,將預(yù)埋鐵件平面緊貼模板,將錨固圓鋼用綁扎或焊接的方法固定在結(jié)構(gòu)內(nèi)的鋼筋上;待混凝土模板拆除后,預(yù)埋鐵件平面外露,將支架、吊架或托架焊接在上面進(jìn)行固定。

  (2) Closely cooperate with the construction of civil engineering structures, tightly adhere the embedded iron parts to the formwork, and fix the anchoring round steel to the steel bars inside the structure by binding or welding; After the concrete formwork is removed, the embedded iron parts should be exposed on the surface, and the brackets, hangers or brackets should be welded on top for fixation.

  (3) 根據(jù)支架承受的荷重,選擇相應(yīng)的膨脹螺栓及鉆頭;埋好螺栓后,可用螺母配上相應(yīng)的墊圈將支架或吊架直接固定在金屬膨脹螺栓上,可參見本標(biāo)準(zhǔn)6.3.7.7圖表。

  (3) Select the corresponding expansion bolts and drill bits based on the load borne by the bracket; After burying the bolts, the bracket or hanger can be directly fixed to the metal expansion bolt with nuts and corresponding washers, as shown in Figure 6.3.7.7 of this standard.

  4.支、吊架安裝

  4. Installation of supports and hangers

  (1) 支架與吊架所用鋼材應(yīng)平直,無顯著扭曲。下料后長(zhǎng)短偏差應(yīng)在3mm范圍內(nèi),切口處應(yīng)無卷邊、毛刺;

  (1) The steel used for brackets and hangers should be straight and free from significant distortion. The length deviation after cutting should be within 3mm, and there should be no curled edges or burrs at the incision;

  (2) 鋼支架與吊架應(yīng)焊接牢固,無顯著變形,焊接前厚度超過4mm的支架、鐵件應(yīng)打坡口,焊縫均勻平整,焊縫長(zhǎng)度應(yīng)符合要求,不得出現(xiàn)裂紋、咬邊、氣孔、凹陷、漏焊等缺陷;

  (2) Steel brackets and hangers should be welded firmly without significant deformation. Brackets and iron parts with a thickness exceeding 4mm before welding should be chamfered, and the weld seam should be uniform and smooth. The weld seam length should meet the requirements and should not have defects such as cracks, undercutting, porosity, indentation, or missed welding;

  (3)支架與吊架應(yīng)安裝牢固,保證橫平豎直,在有坡度的建筑物上安裝支架與吊架應(yīng)與建筑物的坡度、角度一致;

  (3) The brackets and hangers should be installed firmly, ensuring horizontal and vertical alignment. When installing brackets and hangers on buildings with slopes, they should be consistent with the slope and angle of the building;

  支架與吊架的規(guī)格一般不應(yīng)小于扁鋼30mm×3mm;角鋼25mm×25mm×3mm;

  The specifications of brackets and hangers should generally not be less than 30mm × 3mm for flat steel and 25mm × 25mm × 3mm for angle steel;

 ?。?)嚴(yán)禁用電氣焊切割鋼結(jié)構(gòu)或輕鋼龍骨任何部位;

  (5) It is strictly prohibited to use electrical welding to cut any part of steel structures or light steel joists;

 ?。?)吊具應(yīng)采用定型產(chǎn)品,并應(yīng)有各自獨(dú)立的吊裝卡具或支撐系統(tǒng)。

  (6) Universal lifting devices should use standardized products and have their own independent lifting fixtures or support systems.

 ?。?)固定支點(diǎn)間距一般不應(yīng)大于1.5~2m。在進(jìn)出接線盒、箱、柜、轉(zhuǎn)角、轉(zhuǎn)彎和變形縫兩端及丁字接頭的三端500mm以內(nèi)應(yīng)設(shè)固定支持點(diǎn)。

  (7) The distance between fixed support points should generally not exceed 1.5-2m. Fixed support points should be set within 500mm at both ends of the entrance and exit junction boxes, boxes, cabinets, corners, bends, and deformation joints, as well as at the three ends of the T-shaped joint.

  (8)嚴(yán)禁用木磚固定支架與吊架。

  (8) It is strictly prohibited to use wooden bricks to fix brackets and hangers.

  5.橋架安裝

  5. Bridge installation

  (1) 電纜橋架水平敷設(shè)時(shí),支撐跨距一般為1.5~3m,電纜橋架垂直敷設(shè)時(shí)固定點(diǎn)間距不宜大于2m。橋架彎通彎曲半徑不大于300mm時(shí),應(yīng)在距彎曲段與直線段結(jié)合處300~600mm的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)彎曲半徑大于300mm時(shí),還應(yīng)在彎通中部增設(shè)一個(gè)支、吊架。支、吊架和橋架安裝必須考慮電纜敷設(shè)彎曲半徑滿足規(guī)范小彎曲半徑。見表3.1.5。

  (1) When laying cable trays horizontally, the support span is generally 1.5-3m. When laying cable trays vertically, the spacing between fixed points should not exceed 2m. When the bending radius of the tray is not greater than 300mm, a support or hanger should be set on the side of the straight section 300-600mm away from the junction of the curved section and the straight section. When the bending radius is greater than 300mm, a support or hanger should be added in the middle of the bend. The installation of supports, hangers, and cable trays must consider that the bending radius of cable laying meets the minimum bending radius specified in the specifications. See Table 3.1.5.

  注為電纜外徑。

  Note the outer diameter of the cable.

  (2)門型角鋼支架的安裝:梯型橋架沿墻垂直敷設(shè),可使用門型角鋼支架,支架的固定應(yīng)盡可能配合土建施工預(yù)埋。如圖3.1.5(2-1),也可在土建施工中預(yù)埋開角螺栓,用開角螺栓固定支架如圖3.1.5(2-1),也可以采用膨脹螺栓固定。

  (2) Installation of door type angle steel bracket: The ladder type bridge is vertically laid along the wall, and door type angle steel bracket can be used. The fixation of the bracket should be embedded as much as possible in conjunction with civil construction. As shown in Figure 3.1.5 (2-1), angle bolts can also be pre embedded in civil construction to fix the bracket as shown in Figure 3.1.5 (2-1), or expansion bolts can be used for fixation.

  (3)梯型角鋼支架的安裝:橋架沿墻、柱水平安裝時(shí),托壁需安裝在異型鋼立柱上,而立柱要安裝在梯型角鋼支架上,使柱和墻上的橋架固定支架(或托臂)在同一條直線上。制作見圖和表3.1.5(3)底架與門型架焊接時(shí),焊角高度5mm。

  (3) Installation of ladder type angle steel bracket: When the bridge is installed horizontally along the wall or column, the support wall needs to be installed on the special-shaped steel column, and the column needs to be installed on the ladder type angle steel bracket, so that the fixed bracket (or support arm) of the column and the bridge on the wall are in the same straight line. When welding the chassis and door frame as shown in Figure 3.1.5 (3), the welding angle height should be 5mm.

  (4)電纜橋架立柱側(cè)壁式安裝:立柱是直接支承托臂的部件,分工字鋼槽鋼、角鋼、異型鋼立柱;立柱可以在墻上、柱上安裝、也可懸吊在梁板上安裝。做法在混凝土可預(yù)埋鐵件;砌體可砌筑預(yù)制砌塊;也可以采用膨脹螺栓但必須在混凝土強(qiáng)度C20或磚強(qiáng)度在MU10以上的磚砌體上,作法可參照3.1.5(4a、b、c、d、e、f)。

  (4) Side wall installation of cable tray columns: The columns are components that directly support the support arms, and are divided into steel channel steel, angle steel, and special-shaped steel columns; Columns can be installed on walls, columns, or suspended from beams and slabs. The method involves embedding iron components in concrete; Prefabricated masonry blocks can be used for masonry construction; Expansion bolts can also be used, but they must be used on brick masonry with concrete strength C20 or brick strength above MU10. The method can refer to section 3.1.5 (4a, b, c, d, e, f).

  (5)電纜橋架應(yīng)敷設(shè)在易燃易爆氣體管和熱力管道的下方,當(dāng)設(shè)計(jì)無要求時(shí),與管道的小凈距,符合3.1.5(5)的規(guī)定。

  (5) Cable trays should be laid below flammable and explosive gas pipelines and thermal pipelines. When there are no design requirements, the minimum clear distance from the pipeline should comply with the provisions of 3.1.5 (5).

  6 托臂安裝:

  Installation of Arm 6:

  托臂是直接支承托盤、梯架單獨(dú)固定的剛性部件,托臂有螺栓固定可預(yù)埋螺栓,也可采用膨脹螺栓,也可卡接,如圖3.1.6(1)、(2)、(3)、(4)、(5)。

  The support arm is a rigid component that directly supports the tray and ladder frame and is fixed separately. The support arm can be fixed with bolts that can be embedded, expansion bolts, or clamped, as shown in Figure 3.1.6 (1), (2), (3), (4), and (5).

  3.2 橋架安裝

  3.2 Bridge installation

  1.直線段鋼制電纜橋架長(zhǎng)度超過30m,鋁合金或玻璃鋼制電纜橋架長(zhǎng)度超過15m應(yīng)設(shè)有伸縮節(jié),跨越伸縮縫處設(shè)置補(bǔ)償裝置,可用帶伸縮節(jié)的橋架。

  1. If the length of a straight steel cable tray exceeds 30m, or if the length of an aluminum alloy or fiberglass cable tray exceeds 15m, expansion joints should be installed. Compensation devices should be installed at the expansion joint crossing points, and cable trays with expansion joints can be used.

  2.橋架與支架間螺栓、橋架連接板螺栓緊固無遺漏,螺母位于橋架外側(cè),當(dāng)鋁合金橋架與鋼支架固定時(shí),有相互間絕緣防電化措施腐蝕措施,一般可墊石棉墊。

  2. The bolts between the bridge and the bracket, as well as the bolts of the bridge connecting plate, are tightened without omission, and the nuts are located on the outside of the bridge. When the aluminum alloy bridge and the steel bracket are fixed, there are mutual insulation and corrosion prevention measures, and asbestos pads can generally be used.

  3.敷設(shè)在豎井內(nèi)和穿越不同防火區(qū)的橋架,應(yīng)按設(shè)計(jì)要求位置,有防火隔離措施,電纜橋架在電氣豎井內(nèi)敷設(shè)可采用角鋼固定,見圖3.1.8。

  3. Cable trays laid in vertical shafts and crossing different fire zones should be located according to design requirements and have fire isolation measures. Cable trays laid in electrical vertical shafts can be fixed with angle steel, as shown in Figure 3.1.8.

  4.電纜橋架在穿過防火墻及防火樓板時(shí),應(yīng)采取防火隔離措施,防止火災(zāi)沿線路延燃;防火隔離墻、板,應(yīng)配合土建施工預(yù)留洞口,在洞口處預(yù)埋好護(hù)邊角鋼,施工時(shí)根據(jù)電纜敷設(shè)的層數(shù)和根數(shù)用L50×50×5角鋼作固定框,同時(shí)將固定柜焊在護(hù)邊角鋼上;也可以先作好框在土建施工中砌體或澆灌混凝土?xí)r安裝在墻、板中。

  4. When cable trays pass through firewalls and fire-resistant floor slabs, fire-resistant isolation measures should be taken to prevent fires from spreading along the line; Fire isolation walls and panels should be equipped with reserved openings for civil construction, and edge protection angle steel should be pre embedded at the openings. During construction, L50 × 50 × 5 angle steel should be used as a fixed frame according to the number of layers and cables laid, and the fixed cabinet should be welded to the edge protection angle steel; Alternatively, the frame can be installed in the wall or slab during masonry or concrete pouring in civil construction.

  3.3 橋架的接地,當(dāng)設(shè)計(jì)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí),應(yīng)符合下列要求:

  3.3 When the design allows the use of the bridge system to form a grounding main circuit, the grounding of the bridge should meet the following requirements:

  1. 金屬電纜橋架及其支架引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)范:

  1. Metal cable trays and their brackets must have reliable grounding (PE) or neutral (PEN) for the metal cable conduits introduced or led out, and must comply with the following specifications:

  (1) 金屬電纜橋架及其支架全長(zhǎng),與接地(PE)或接零(PEN)干線相連接不小于2處,使整個(gè)橋架為一個(gè)電氣通路。

  (1) The entire length of the metal cable tray and its support shall be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points, making the entire tray an electrical pathway.

  (2) 非鍍鋅電纜橋架間連接的兩端跨接銅芯接地線,接地線小允許截面積不小于4mm2。

  (2) The two ends of the non galvanized cable tray are connected with copper core grounding wires, and the minimum allowable cross-sectional area of the grounding wire is not less than 4mm2.

  (3) 鍍鋅電纜橋架間連接板的兩端可不跨接接地線,但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  (3) The two ends of the connecting plate between galvanized cable trays may not be connected to the grounding wire, but there shall be no less than 2 fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  2. 盤、梯架端部之間連接電阻不應(yīng)大于0.00033Ω并應(yīng)用等電位聯(lián)結(jié)測(cè)試儀(導(dǎo)通儀)或微Ω表測(cè)試,測(cè)試應(yīng)在連接點(diǎn)的兩側(cè)進(jìn)行,對(duì)整個(gè)橋架全長(zhǎng)的兩端連接電阻不應(yīng)大于0.5Ω或由設(shè)計(jì)決定,否則應(yīng)增加接地點(diǎn),以滿足要求。接地孔應(yīng)涂層,與涂層接觸的螺栓有一側(cè)的平墊應(yīng)使用帶爪的專用接地墊圈。

  2. The connection resistance between the ends of the tray and ladder should not exceed 0.00033 Ω and should be tested using an equipotential bonding tester (continuity meter) or a micro Ω meter. The test should be conducted on both sides of the connection point, and the connection resistance at both ends of the entire length of the bridge should not exceed 0.5 Ω or be determined by the design. Otherwise, a grounding point should be added to meet the requirements. The grounding hole should eliminate the coating, and the flat pad on one side of the bolt in contact with the coating should use a special grounding washer with claws.

  3. 伸縮縫或軟連接處需采用編織銅線連接。沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)托盤、梯架應(yīng)小有一點(diǎn)與接地干線可靠連接;在接地部位的連接處應(yīng)裝置彈簧墊圈,以免松動(dòng)。

  3. Expansion joints or soft connections should be connected using braided copper wires. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the tray and ladder should be reliably connected to the grounding main line at a small point; A spring washer should be installed at the connection point of the grounding part to prevent loosening.

  電纜橋架作為布線工程的一個(gè)配套項(xiàng)目,目前尚無專門的規(guī)范指導(dǎo),個(gè)生產(chǎn)廠家的規(guī)格程式缺乏通用性,因此,設(shè)計(jì)選型過程應(yīng)根據(jù)弱電各個(gè)系統(tǒng)纜顯得類型、數(shù)量,合理選定適用的橋架。(1)確定方向: 根據(jù)建筑平面布置圖,結(jié)合空調(diào)管線和電氣管線等設(shè)置情況、方便維修,以及電纜路由的疏密來確定電纜橋架的路由。在室內(nèi),盡可能沿建筑物的墻、柱、梁及樓板架設(shè),如許利用綜合管廊架設(shè)時(shí),則應(yīng)在管道一側(cè)或上方平行架設(shè),并考慮引下線和分支線盡量避免交叉,如無其它管架借用,則需自設(shè)立(支)柱。

  As a supporting project of wiring engineering, there is currently no specialized specification guidance for cable trays, and the specifications and programs of individual manufacturers lack universality. Therefore, the design and selection process should be based on the type and quantity of cables in various weak current systems, and the appropriate cable tray should be selected reasonably. (1) Determine direction: Determine the optimal route for cable trays based on the building layout plan, combined with the installation of air conditioning and electrical pipelines, convenient maintenance, and the density of cable routing. Indoors, try to install along the walls, columns, beams, and floor slabs of the building as much as possible. When using a comprehensive pipe gallery for installation, parallel installation should be carried out on one side or above the pipeline, and consideration should be given to avoiding crossing of down conductors and branch lines as much as possible. If there are no other pipe racks to borrow, self installing (supporting) columns is required.

  (2)荷載計(jì)算:計(jì)算電纜橋架主干線縱斷面上單位長(zhǎng)度的電纜重量。

  (2) Load calculation: Calculate the weight of cables per unit length on the longitudinal section of the main cable tray.

  (3)確定橋架的寬度:根據(jù)布放電纜條數(shù)、電纜直徑及電纜的間距來確定電纜橋架的型號(hào)、規(guī)格, 托臂的長(zhǎng)度,支柱的長(zhǎng)度、間距,橋架的寬度和層數(shù)。

  (3) Determine the width of the cable tray: Determine the model and specifications of the cable tray, the length of the support arm, the length and spacing of the pillars, the width and number of layers of the cable tray based on the number of cables laid, the diameter of the cables, and the spacing between the cables.

  (4)確定安裝方式:根據(jù)場(chǎng)所的設(shè)置條件確定橋架的固定方式,選擇懸吊式、直立式、側(cè)壁式或是混合式,連接件和緊固件一般是配套供應(yīng)的,此外,根據(jù)橋架結(jié)構(gòu)選折相應(yīng)的蓋板。

  (4) Determine installation method: Determine the fixing method of the bridge according to the setting conditions of the site, choose suspended, upright, side wall or hybrid, and the connectors and fasteners are generally supplied together. In addition, select the corresponding cover plate according to the structure of the bridge.

  (5)繪出電纜橋架平、剖面圖,局部部位還應(yīng)繪出空間圖,開列材料表。

  (5) Draw a plan and section diagram of the cable tray, and also draw a spatial diagram of some parts, and list the material list.

  2、如與電力電纜橋架合用時(shí),應(yīng)將電力電纜和弱電電纜各直一側(cè),中間采用隔板分隔。

  2. When used in conjunction with power cable trays, the power cables and weak current cables should be placed on one side each, and separated by a partition in the middle.

  3、弱電電纜與其它低電壓電纜合用橋架時(shí),應(yīng)嚴(yán)格執(zhí)行選擇具有外屏蔽層的弱電系統(tǒng)的弱電電纜,避免相互間的干擾。

  3. When weak current cables are used in cable trays with other low voltage cables, it is necessary to strictly select weak current cables with external shielding layers to avoid interference between them.

  4、電纜橋架安裝要求

  4. Installation requirements for cable trays

  (1)槽式大跨距電纜橋架由室外進(jìn)入建筑物內(nèi)時(shí),橋架向外的坡度不得小于1/100。(2)電纜橋架與用電設(shè)備交越時(shí),其間的凈距不小于0.5m。

  (1) When the trough type large-span cable tray enters the building from the outside, the outward slope of the tray shall not be less than 1/100. (2) When the cable tray intersects with electrical equipment, the clear distance between them shall not be less than 0.5m.

  (3)兩組電纜橋架在同一高度平行敷設(shè)時(shí),其間凈距不小于0.6m。(4)在平行圖上繪出橋架的路由,要注明橋架起點(diǎn)、終點(diǎn)、拐彎點(diǎn)、分支點(diǎn)及升降點(diǎn)的坐標(biāo)或定位尺寸、標(biāo)高,如能繪制橋架敷設(shè)軸側(cè)圖,則對(duì)材料統(tǒng)計(jì)將更精確。

  (3) When two sets of cable trays are laid in parallel at the same height, the clear distance between them should not be less than 0.6m. (4) When drawing the routing of the tray on a parallel diagram, the coordinates or positioning dimensions and elevations of the starting point, ending point, turning point, branching point, and lifting point of the tray should be indicated. If a cable tray laying axis side diagram can be drawn, the material statistics will be more accurate.

  直線段:注明全長(zhǎng)、橋架層數(shù)、標(biāo)高、型號(hào)及規(guī)格。拐彎點(diǎn)和分支點(diǎn):注明所用轉(zhuǎn)彎接板的型號(hào)及規(guī)格。升降段:注明標(biāo)高變化,也可用局部大樣圖或剖面圖表示。

  Straight line segment: indicate the total length, number of bridge layers, elevation, model, and specifications. Turning and branching points: indicate the model and specifications of the turning joint used. Lifting section: indicate the elevation change, and it can also be represented by local detailed drawings or sectional drawings.

  (5)橋架支撐點(diǎn), 如立柱、托臂或非標(biāo)準(zhǔn)支、構(gòu)架的間距、安裝方式、型號(hào)規(guī)格、標(biāo)高,可同意在平面上列表說明,也可分段標(biāo)出用不同的剖面圖、單線圖或大樣圖表示。

  (5) The spacing, installation method, model specifications, and elevation of bridge support points, such as columns, brackets, or non-standard supports and structures, can be listed and explained on the plane, or segmented and marked with different sectional drawings, single line drawings, or detailed drawings.

  (6)電纜引下點(diǎn)位置及引下方式,一般而言,大批電纜引下可用垂直彎接板和垂直引上架,少量電纜引下可用導(dǎo)板或引管,注明引下方式即可。

  (6) Generally speaking, for a large number of cable leads, vertical bending plates and vertical lead frames can be used, while for a small number of cable leads, guide plates or guide pipes can be used, indicating the lead method.

  (7)電纜橋架宜高出地面2.2米以上,橋架頂部距頂棚或其它障礙物不應(yīng)小于0.3米,橋架寬度不宜小于0.1米,橋架內(nèi)橫斷面的填充率不應(yīng)超過50%。

  (7) The cable tray should be at least 2.2 meters above the ground, and the distance between the top of the tray and the ceiling or other obstacles should not be less than 0.3 meters. The width of the tray should not be less than 0.1 meters, and the filling rate of the cross-section inside the tray should not exceed 50%.

  (8)電纜橋架內(nèi)纜線垂直敷設(shè)時(shí),在纜線的上端和每間隔1.5米處應(yīng)固定在橋架的支架上,水平敷設(shè)時(shí), 在纜線的首、尾、轉(zhuǎn)彎及每間隔3~5米處進(jìn)行固定。

  (8) When the cables are vertically laid in the cable tray, they should be fixed on the brackets of the tray at the upper end and every 1.5 meters. When laid horizontally, they should be fixed at the beginning, end, turn, and every 3-5 meters.

  (9)在吊頂內(nèi)設(shè)置時(shí),槽蓋開啟面應(yīng)保持80毫米的垂直凈空,線槽截面利用率不應(yīng)超過50%。

  (9) When installed in the ceiling, the opening surface of the trough cover should maintain a vertical clearance of 80 millimeters, and the utilization rate of the trough section should not exceed 50%.

  (10)布放在線槽的纜線可以不綁扎,槽內(nèi)纜線應(yīng)順直,槽內(nèi)纜線應(yīng)順直,盡量不交叉,纜線不應(yīng)溢出線槽,在纜線進(jìn)出線槽部位, 轉(zhuǎn)彎處應(yīng)綁扎固定。垂直線槽布放纜線應(yīng)每間隔1.5米固定在纜線支架上。

  (10) The cables laid in the cable trough can be left unbound. The cables inside the trough should be straight and straight, avoiding crossing as much as possible. The cables should not overflow from the trough. They should be tied and fixed at the entrance and exit of the trough, as well as at turns. The cables laid in the vertical cable tray should be fixed on the cable support every 1.5 meters.

  (11)在水平、垂直橋架和垂直線槽中敷設(shè)線時(shí),應(yīng)對(duì)纜線進(jìn)行綁扎。4對(duì)線電纜以24根為束,25對(duì)或以上主干線電纜、光纜及其它信號(hào)電纜應(yīng)根據(jù)纜線的類型、纜徑、纜線芯數(shù)分束綁扎。綁扎間距不宜大于1.5米,扣間距應(yīng)均勻,松緊適度。

  (11) When laying wires in horizontal and vertical cable trays and vertical trunking, the cables should be tied. 4-pair cables should be bundled with 24 cables, and 25 or more pairs of backbone cables, optical cables, and other signal cables should be bundled and tied according to the type, diameter, and number of cable cores. The binding spacing should not exceed 1.5 meters, the buckle spacing should be uniform, and the tightness should be moderate.

  (12)橋架水平敷設(shè)時(shí),支撐間距一般為1.5-3m,垂直敷設(shè)時(shí)固定在建筑物構(gòu)體上的間距宜小于2m。

  (12) When laying the bridge horizontally, the support spacing is generally 1.5-3m, and when laying vertically, the spacing fixed on the building structure should be less than 2m.

  電纜橋架型式及品種的選擇及鋪設(shè)規(guī)范

  Selection and laying specifications for cable tray types and varieties

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected

  2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類復(fù)合環(huán)氧樹脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。

  2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。

  3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  4、在公共通道或戶外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤 。大跨距跨越公共通道時(shí),可根據(jù)用戶要求提高橋架的載荷能力或選用行架。

  4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements.

  5、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶外要選用復(fù)合環(huán)氧樹指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、電纜橋架規(guī)格選擇

  2、 Selection of cable tray specifications

  1、復(fù)合環(huán)氧樹脂電纜橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量。

  1. The width and height of the composite epoxy resin cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% formula development margin should be reserved.

  2、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套。

  2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame.

  3、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿足荷載的要求。

  3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load.

  4、橋架橫截面積的選擇見表橋架上電纜網(wǎng)絡(luò)中任一線路的自動(dòng)過電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)0-60 12961-100 258101-200 452201-400 645401-600 968

  4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the cable tray (A). The minimum allowable cross-sectional area of the cable tray (mm2) is 0-60 12961-100 258101-200 452201-400 645401-600 968

  三、對(duì)于電纜橋架的支、吊架的配置

  3、 Configuration of supports and hangers for cable trays

  1、戶內(nèi)支、吊短跨距一般采取1.5-3m。戶外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線段與直線結(jié)合處300-600m的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、拉擠玻璃鋼電纜橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of extruded fiberglass cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火:要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。

  4、 Fire prevention: Steel or non combustible and flame-retardant materials must be used in the sections where bridge frames are required to be fire-resistant.

  五、拉擠玻璃鋼電纜橋架的接地

  5、 Grounding of extruded fiberglass cable tray

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容:橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  6、 Bridge system design content: The bridge system engineering design should be closely coordinated with civil engineering, technology, and related disciplines to determine the optimal layout. Its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。2、橋架系統(tǒng)的平面布置圖。3、橋架系統(tǒng)所需直線段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說明。4、有特殊要求的非標(biāo)件技術(shù)說明或示意圖。

  1. Relevant sectional drawings of the bridge system. 2. Layout plan of the bridge system. 3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations. 4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝:電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》。

  7、 Installation: For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠家配齊。4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說明或示圖。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements. 4. Non standard technical specifications or diagrams with special requirements.

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)   2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類復(fù)合環(huán)氧樹脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。  4、在公共通道或戶外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤 。大跨距跨越公共通道時(shí),可根據(jù)用戶要求提高橋架的載荷能力或選用行架?! ?、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected. 2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements. 5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶外要選用復(fù)合環(huán)氧樹指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、規(guī)格選擇

  2、 Specification selection

  1、橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量?! ?、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套?! ?、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿足荷載的要求?! ?、橋架橫截面積的選擇見表   橋架上電纜網(wǎng)絡(luò)中任一線路的自動(dòng)過電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)   0-60 129   61-100 258   101-200 452   201-400 645   401-600 968

  1. The width and height of the cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% of the formula development margin should be reserved. 2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame. 3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load. 4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the tray (A). The minimum allowable cross-sectional area of the tray (mm2) is 0-60 129 61-100 258 101-200 452 201-400 645 401-600 968

  三、支、吊架的配置

  3、 Configuration of supports and hangers

  1、戶內(nèi)支、吊短跨距一般采取1.5-3m。戶外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線段與直線結(jié)合處300-600m的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火

  4、 Fire prevention

  要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。我公司生產(chǎn)的BJⅢ系列電纜橋架均為防火橋架。

  The section requiring bridge fire prevention must be made of steel or non combustible and flame-retardant materials. The BJ III series cable trays produced by our company are all fire-resistant trays.

  五、接地

  5、 Grounding

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容

  6、 Design content of bridge system

  橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  The design of bridge system engineering should be closely coordinated with civil engineering, technology, and relevant disciplines to determine the optimal layout, and its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。

  1. Relevant sectional drawings of the bridge system.

  2、橋架系統(tǒng)的平面布置圖。

  2. Layout plan of the bridge system.

  3、橋架系統(tǒng)所需直線段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說明。

  3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations.

  4、有特殊要求的非標(biāo)件技術(shù)說明或示意圖。

  4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝

  7、 Installation

  電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》04D701-3。

  For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" 04D701-3 issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠家配齊。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements.

  4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說明或示圖。

  4. Non standard technical specifications or diagrams with special requirements.

  本文由  濟(jì)南電纜橋架  友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊  http://m.zrbg1.com/  真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://m.zrbg1.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
小草影视| 国产亚洲av片在线观看18女人| 91精品国产综合久久国产大片| 人妻少妇偷人精品无码不卡| 成a人v在线观看视频| 久久久精品欧美一区二区免费| 日韩激情片| j插b| 国产精品女同一区二区| 麻豆文化传媒有限公司视频| 五十路六十路七十路熟婆| 五月天成人影院| 中文字幕AV网站| 亚洲精品v日韩精品| 91国视频在线观看| 好男人资源网在线视频观看免费| 日韩无码第三页| 国产91精品久久久久久久| 夜夜高潮天天爽欧美| 国产精品久久久久无码AV| 日本亚洲欧洲另类图片| 麻豆视频| 欧美极品少妇| 亚洲天堂午夜| 九九99re热线精品视频| 欧美日韩偷拍自拍| 少妇又紧又色又爽又刺激视频| 91麻豆精品秘密入口| 无码AV免费精品一区二区三区| 亚洲成人Av在线观看| 国模吧一区二区三区| 色窝窝无码一区二区三区| 亚洲精品AV无码永久无码| 国产AV一区二区三区天堂综合网| 91男女视频| 精品久久久中文字幕人妻| 五月婷婷在线观看| 国产99热在线观看| 国产精品96| 尤物网址在线观看| caoporn成人免费视频| 色呦在线| 国产av日韩av| 国产欧美日韩一区| 国产在线观看香蕉视频| 久久99精品久久久久| 国产AV精国产传媒| 免费网站在线入口| 一区二区欧美在线| 人人爱人人做| 无限观看视频大全直播| 天天操夜夜操视频| 山西订婚强奸案入选最高法案例| 亚洲欧美日韩专区| 日韩欧美一区二区无码免费| 伊人精品综合| 亚洲熟女乱综合一区二区三区| 久久久日韩精品一区二区| 亚洲第一二三四区| 暖暖 免费 视频 在线 视频| 日韩欧美人妻少妇| www.992Tv| 亚洲欧洲中文字幕| 播五月开心婷婷综合| 无码人妻精品一区| 先锋影音资源av| 国产精品欧美劲爆可乐| 日本精品人妻无码免费大全| 日韩精品久久无码一区二区| 巨胸喷奶水WWW冈哺乳期| 午夜福利国产在线观看| 国产黄色电影一区| 暖暖视频免费观看视频中国...| 99久久丫e6| 性受xxxx黑人xyx性爽| 久久天天操| 精品人妻无码AV波多野结衣| 中文无码不卡| 强壮公引诱人妻| 欧美性xxxxx极品少妇| av免费大片| 国产麻豆精选AV| 免费的av网站| 正在播放国产一区| 肉大捧一进一出免费视频| 亚洲AV无码精品黑人黑| www黄在线观看| 日韩码一码二码三码区别69| 国产视频xxx| 日本人妻丰满熟妇| 无套内谢大学生A片| 午夜福利视频看看| 羞羞影院| gogo亚洲高清大胆美女人体| 国产不卡在线视频| 成人免费视频caoporn| 久久夜色成人| 欧美日韩精品在线观看| 大地资源中文第二页日本| 顶级高潮集合| 开心五月激情五月| 色偷偷综合| 日韩精品视频在线| 国产精品人妻熟女a8198v久| 大香蕉综合网| 亚洲精品久久久久久无码AV| 四虎影院一区二区| 欧美视频一区二区三区| 国产小黄片在线| av中文字幕一区二区三区| 欧美HD另类VR| 四虎久久久| 久久久久久久久久久久99| 麻豆AV传媒在线播放免费观看| av一区+二区在线播放| 国产亚洲视频在线播放香蕉| 91久久国产综合| 国产麻豆一区二区| 国产1988精品A片| 男生怎么让自己变大变长变粗| 看一级黄色片| 三级视频在线看| 国产精品麻豆| 国产操比| 午夜日韩精品| 成年免费视频播放网站推荐| 亚洲av线| 99久久精品国产免费| 清清草免费视频| 国产精品污视频| 成人视频无码| 熟女一区二区| 在线h片| 污网站视频在线观看| 成人网站YSL千人千色| www.久草.com| 床震吃奶摸下成人A片在线观看| 久久综合大香蕉| 小小影院| 久久久噜噜噜久久熟女av| 污污内射在线观看一区二区少妇| 99久6久热在线播放| 亚洲久久成人| 久久66热人妻偷产国产| 欧美日韩三级视频| 四平青年全集优酷| 国产精品 日韩无码| 思思久久99热只有频精品66| 99一区二区三区| 蜜芽视频在线观看视频免费播放| 欧美一级欧美三级| 久久精品国产亚洲麻豆小说| 国模杨依粉嫩蝴蝶150p| 麻豆文化传媒网站入口迎新年| 亚洲精品国产一区二| 久久久久久国产精品| 国产亚洲精品久久久久久大师| 日韩专区欧美专区| 高潮91PORN成人| 久久久夜| 国产成人无码午夜福利| 成人久久| 麻豆999| 高清无码一区二区三区| 色色的视频网站| 久久一区二区三区精华液| 无码人妻精品一区二区免费看| 97看片| 囯产精品无码一区二区久久| www.欧美| 亚洲毛片免费在线观看| 国产ar高清视频 视频| 天天色天天综合| www国产精品| AV毛片网址| 午夜福利2017福利| 四虎免费影视| 丁香社区网站| 大香蕉97| 亚洲精品久久久久秋霞| 久久久久99精品国产片| 欧美性爱视频免费看| 日韩一级欧美一级| 韩国无码精品| 国内一卡二卡三2020视频| 欧日韩无码| 91成人啪国产啪永久地址| 日韩aV一级毛片| 国产无线乱码一区二三区| 国产av超碰| 粉嫩AV久久一区二区三区| 人人爽人人草| 日本多毛熟妇| 18禁无遮挡肉动漫在线播放观看 | 在线观看国产一区二区| 777琪琪午夜理论电影网| 国产AV三级片| 大地影院大全在线观看| 天天日天天射天天| 国产精品啪| 丁香社区五月天| 午夜免费网站| 三级黄色网络| 精选一区二区| 暖暖直播高清在线中文| 婷婷丁香色| 国产在线观看香蕉视频| 精品无码少妇| 色色精品视频| 暖暖直播免费观看视频琪琪| 国产偷拍无码| 青青草综合| www.伊人| 9191视频| 五月色丁香婷婷网蜜臀AV| 色婷婷狠狠爱| 欧美日韩色情| 国产精品久久久久久久久99热| 一级色网站| 日本亚洲欧洲另类图片| www.九色| 美女张开腿让我操| 国产午夜精品A片一区仙踪林| 少妇高潮无遮挡毛片免费播放| 国产日韩欧美高清免费视频| wwww国产| 五月丁香美女| 久久精品视在线观看2| 正在播放亚洲无码| 欧美日本韩国一区| 91久久精品国产亚洲| 天天射天天日天天干| 加勒比人妻| 免费精品人在线二线三线区别| 欧美性爱视频久久| 麻豆AV久久无码精品九九| jzzjzzjzz亚洲熟女少妇| av综合网站| 麻豆传煤网站网址入口| 成人无码一区二区| 97精品久久久久久久久久| 久久精品AV麻豆| 日韩女人性猛交| 国产毛片欧美毛片久久久| 欧美日韩不卡视频| 欧美夜夜夜| 少妇水多A片太爽了| 亚洲五月激情| 国产欧美一区二区三区不卡高清| 羞羞午夜福利免费视频| 国产人成视频| 91九色网站| 国产成人久久AV免费高潮| 日韩无码大片| 懂色AV一区在线播放| 久久久久久国产视频| 国产精品性爱| AV毛片在线| 青青操91| 美女踩踏专辑| 五月丁香中文| 97精品欧美一区二区三区 | 特级毛片www| 免费黄网在线观看| 狠狠精品干练久久久无码中文字幕 | 国产欧美久久久久| 久久久久久黄| 成人A毛片| 麻豆精品免费观看| 婷婷六月丁香缴 清| 熟妇人妻无码XXX视频| 精品91久久| 天堂草原电视剧在线观看| 国产传媒精品| www无码视频| 欧美精品一区二区三区免费视频 | 亚洲福利视频在线| 秋葵视频IOS无限制解码免费 | 国产91专区| 国产剧情久久| 天天射天天射天天干天天亲天天狠| 婷婷四房播播| 中文字幕无线观看免费| 亚洲黄色影院| av强奸乱伦| 丁香花视频免费播放社区| 亚洲无码黄色| 久久精品系列| 午夜福利在线观看一区| 射18p| 91视频精品| 久久久精品人妻一区三区蜜桃| 久久精品视频2| 免费网站观看WWW免费下载| 久久久久亚洲| 午夜免费试看| 99久久精品午夜一区二区三区| 欧美阿v高清资源不卡在线播放| 久久免费国产精品| AV免费观看网址| 久久免费看毛片| 国产精品爽爽久久久久久竹菊| 国产精品无码在线播放| 五月天成人在线| 自拍亚洲在线播放视频| 国产凹凸熟女一区二区| sky angel vol.66| 欧美 日韩 精品| 四虎在线网址| 精品乱伦一区二区| 日韩电影一区| 日本妇人成熟A片高潮小说| 一区二区三区不卡视频| 日韩av色色| 久久免费精品| 国产精品2025| 综合久久国产九一剧情麻豆| 日本湿妺影院免费观看| 亚洲avapp| 亚洲一区高清| 超级碰在线| yazhousetu26uuu| 最近更新中文字幕在线2018二| 无码精品A∨在线观看中文| 少妇无码AV一区二区三区| 99国产精品人妻噜啊噜| 99RE久久爱五月天婷婷| 欧洲se图| 99久久久久无码国产精品免费| 色婷婷国产| 最新无码网址| 国产无码视屏| 精品一区二区三区AV天堂| 日产一线二线三线哺乳| 久久久久久久久久一级| 色呦呦国产精品| 日韩欧美成人一区| a级视频在线观看| 国产调教在线| 中文无码在线视频| 精品国产久九九| 成人精品视频一区二区三区尤物| 四虎黄色影院| 日韩黄片观一区二区三区| 97无码精品人妻一区二区三区麻豆| 亚洲国产日韩精品一区二区三区| 办公室里呻吟的丰满老师电影| 琪琪视频在线观看| 精品人妻一区二区三区换脸明星| 91AV一区二区| 美女黄视频大全| 亚洲综合另类图片| 经典国产一区二区三区| 无码中文欧美一区二区三| 成全视频在线观看在线播放高清| www.2020| 欧美日本国产| 精品人妻一区二区三区日产乱码| 国产精品色呦呦| 特级毛片免费| 超碰日本| 欧美三级一区二区三区| 加勒比人妻| 亚洲精品国偷拍电影自产在线| 成人精品国产亚洲AV久久| 热久久免费视频精品38| 久久久极品| 久久网av| 午夜av网站| 一区二线视频| 亚洲欧美在线一区二区| 精品国产乱码一区二区三区的特点| 精品不卡高清视频在线观看| 高潮喷水无码AV亚洲| 亚洲A片一区日韩精品无码| 在线观看日韩AV| 久久囯产精品99蜜桃传媒| 国模小黎自慰GOGO人体| 国产人妻无码一区二区三区| 日韩青青草| 91日韩视频| 亚洲国产精选| 亚洲性生活网站| 日韩国产高清无码| 久久99人妻免费精品一区| 国产69精品久久久久乱码韩国| 国内精品自在自线视频| av狼最新网址| 精品日产乱码卡一卡2卡| 麻豆视传媒短视频在线观看| 蜜桃成人网站| 日本欧美一区| 亚洲图片一区| 国产精品无码专区| 99久久精品国产毛片| 久久久久无码精品国产91福利| 日韩影院在线观看| 中文字幕一区二区三区夫目前犯| 欧美精品亚洲| 综合色综合| 日韩国产亚洲欧美| 五月丁香激情久久| 婷婷五月激情视频| 亚洲蜜桃av一区二区| 黄片专区| 黄色一级片子| 少妇无码AV一区二区三区| 福利片一区| 色天堂色男人| 免费在线成人| 国产xxx视频| 二区av| 深夜福利AV| 一区二区三区四区五区六区| 精品乱伦一区二区| 日韩欧美久久精品| 精品国产一区二区三区四| 超碰人人摸| 日韩一级色| 成人网页在线观看| 免费视频91| 久久亚洲AV无码| 久久97超碰| 欧美亚洲国产精品| 国产免费操逼视频| 中文在线字幕观看电视剧| 伊人久久国产精品| 日韩无码一本| 国产污视频在线| 久久精品国产99久久| 日韩欧美在线一区二区| 99久久免费精品| 国产精品99久久| 大香蕉久| 一区二区三区日韩欧美| 亚洲无码精品一区二区三区| 日韩永久免费| 国产 亚洲 中文在线 字幕| YYY111111日本无码| 成全视频免费高清游戏| 琪琪午夜伦伦A片| 免费成人美女在线观看| 色综合久久av| 四虎影院在线免费观看| 丁香五月区| 国产91在线精品| 成人乱码一区二区三区AV| 亚洲高清无码视频| 无码国产一区二区三区 | 亚洲我射| 欧美黄色一级| 国产精品精| 麻豆网站在线免费观看| 大香蕉com| 国产无码视屏| 在线观看av的网站| 午夜免费福利电影| 超碰777| 一本一道加勒比无码aⅴ| 国产精品亚洲一区二区三区久久| 中文字幕精品久久久| 久99久久久无码精品国产| 国产精品亚洲成在人线| 久久99热人妻偷产国产| 久草在线视频免费资源观看| 大地资源二中文官网| 99热这里只有精品免费国产| 亚洲 欧美 日韩在线| 国产不卡精品| 不卡的aV在线观看| 日本熟妇丰满| 国产变态另类| 都市激情亚洲| 亚洲精品无AMM毛片| 日本无人区码一码二码三码四码| 欧美ⅹxxxx18性欧美| 国产热久久精| 国内无码在线| 免费不卡的av| 欧美黑人精品一区二区| 中文精品在线| 免费人成精品欧美精品| 欧美 亚洲 中文 国产 综合| 亚洲阿v天堂在线2017| 韩国三级bd高清中字在线观看| 亚洲图片 欧美| 日韩福利精品| 91成人精品视频| 国产精品久久久久久久久久红粉| 欧美亚洲熟妇一区二区三区 | 香蕉视频黄在线观看| 69精品人人槡人妻人人玩蜜桃| 国产又粗又猛又黄又爽无遮挡| 久久99这里只精品热在线| 大地资源第二页在线观看完整版 | 国产a自拍| 日韩高清一二三区| 超碰超碰| 野花2019最新社区免费| 精品无人区麻豆乱码1区2区| 昭和五十路和六十路| a毛片网站| 特级毛片无码免费视频| 日韩av免费| 2018高清国产一区二区三区| 久久久九色综合亚洲成色777| 亚洲精品精华液一区二区| 国产日产欧美| 另类综合网| 国产三级久久久精品麻豆三级| 国产亚洲AV片天天在线观看| 湿妺影院免费观看区| 成年免费视频播放网站推荐| 另类视频在线| 中国性爱一级片| 懂色aⅴ精品一区二区三区| 激情一二三| 91精品导航| 最近中文字幕2019免费版日本| 国产亚洲精品久久久久久豆腐| 琪琪布电影网| 正在播放亚洲无码| 一区二区视频传媒有限公司| 大地影视资源中文官网| 日日日插插插| 一区二区激情| 日干夜干天天干| 中文字幕人妻丰满熟女| 国产99久久久国产精品免费看| 亚洲毛片网站| 国产剧情| 无码午夜福利| 日日噜噜大屁股熟妇| 又粗又长又黄视频| 亚洲熟女色| 欧美日韩高清一区| 桃花社区在线观看视频| 亚洲免费高清无码| 有码在线播放| 玖玖精品在线| 国产精品人妻久久久999| 国模精品| 欧美激情一区二区三级高清视频| 久久精品久久久久久久| 把腿张开JI巴CAO死你爽男| 女人操逼网站| 欧美熟女一区二区| 婷婷激情四射| 最近中文字幕完整版2018免费| 香蕉大人久久国产成人AV| 精品成人夫妻AV| 国产suv精品一区二区69| 亚洲乳大丰满中文字幕| 99久久精品国产高清一区二区| 国产精品免费麻豆| 成人无码片黄网站A毛片免费| 热の综合热の国产热の潮在线| 国产日韩欧美高清免费视频| 国产又长又大又粗| 国产无码电影在线| 日日噜噜大屁股熟妇| 国产在线一区二区三区四区 | 天天高潮夜夜爽| 中文字幕亚洲无码aV| 精品一区久久久| 最近中文字幕在线的MV视频| 国产成人二区| 久久精品国产亚洲AV香蕉 | 麻豆午夜视频| 日本91| 综合Av在线| 日日夜夜国产| 中文字幕熟女人妻佐佐木明| 日韩成人精品一区二区三区| 国模小黎自慰GOGO人体| 精品久久久久久无码不卡| 伊人AV影院| 国产精视频| 综合五月天| 爱爱激情| 亚洲AV无码成人毛片一级网站| 日韩电影免费| 国产精品麻豆高潮刺激A片| 一二三产区| 午夜福利激情| 抽插嗯好爽好舒服好大| www.久久久久.com| 欧美三级视频| 十八禁无遮挡99精品国产| 欧美人妻熟妇| 国产精品久久午夜夜伦鲁鲁| 国精产品99永久中国有限公司 | 色呦呦免费视频| 亚洲第1页| 日韩欧美一区视频| 亚洲国产精品vA在线| 99热在线精品免费| 国产精品99无码一区二区| 麻豆MD传媒在饯观看免费| 在线国产精品视频| 亚洲性爱欧美| 暖暖视频免费高清完整| 婷婷爱五月| 亚洲精品a| 国产精视频| 91女同| 国产香蕉视频在线观看| 日韩偷拍一区| 日日夜夜精品| 91麻豆精品国产91久久久久久| 老熟妇高潮一区二区三区| 87福利电影| 国产精品做爱| 影音先锋中文无码一区| 五十老熟妇乱子伦av| 午夜九九九| 大地电影资源第二页| 乱码一区二区三区四区| 亚洲欧美日韩在线不卡| 同房干涩没水怎么改善女性| 精品日韩在线| 大地资源影视中文官网入口| 亚洲免费大片| 欧美日韩网| 日韩精品一卡二卡| 亚洲AV无码卡一卡二在线观看| 大地资源二中文在线播放免费| 欧美人妻久久精品二区三区特黄| 欧美亚洲熟妇一区二区三区 | 亚洲欧美人成无码苍井空| 亚洲男人的av天堂| 中文字幕综合网| 欧美一区二区三区久久综| 留学生刘玥与洋外教的关系| 暖暖 视频 免费 高清 日本在线观看| 日韩欧美久久精品| 色噜噜国产精品视频一区二区| 吃女王的浓痰和鼻涕视频| 黄色成人免费观看| 大地影视资源中文官网| 成人精品电影| 国产内射大片99| 在线a视频| 免费的精品一区二区三区A片| 成人a影院| 特黄aaaaaaaaa真人毛片| 中文字幕成人网| 欧美成人高清| md豆传媒app地址入口免费看| 99精品久久99久久久久| 天天在线视频观看视频| 日韩AV影院| 调教妺妺荡乳欲伦交换H小说| 性色国产成人久久久精品| 久久人妻熟女中文字幕AV蜜芽| 无码人妻一区二区三区四区免费看| 久久久久成人网| 欧美午夜成人影院| 国产精品乱码一区二区三区| 日产又大又黄又爽又猛| 一道本久在线中文字幕| 欧美国产日产一区二区| 骚视频在线观看| 开心情色站| 国产精品区一区二区三区| 国产色情综合五色丁香小说| 精品在线不卡| 青青青草国产费观看| 日本天堂在线视频| 神马电影院午夜神福利不卡| 欧美人成视频在线观看| AV亚洲AV永久无码精品网| JLZZJLZZJLZZ| 久草原精品资源视频| 国产欧美三级| 好的h网站| 国产精品自在线拍| 四房播播五| 五月丁香伊人| 国产第一页在线| 亚洲成av| 亚洲中文字幕一二三区| 99久久久久无码国产精品免费| 精品国产18久久久久久怡红| 国产美女在线观看| 粉嫩av浪潮av蜜臀绯色av蜜桃| 色婷婷一区二区三区| 在线观看黄色AV网站| 91免费在线| 日韩午夜三级| 久久日产一线二线SU| 五月天操逼| 大地资源二中文在线观看官网最新 | 久久久老熟女一区二区三区| 2017国产小视频| 久久一久久| www.色小姐.com| 人妻精品久久久久中文字幕19| 亚洲13p| 黄色影视| 国产美女自慰网站| 三ji片区电影| 国产偷人妻精品一区k八理伦电影| 色婷婷小说| 国产成人无码a区在线观看导航| 九九久久久久| 亚洲人妻久久久| 欧美黑大粗aaaaa级在线特区| 麻豆传煤app官网网页入口下载 | 熟女一级片| 午夜dj在线观看免费完整高清视频| 国精无码欧精品亚洲一区蜜桃| 欧美性猛交XXXX乱大交极品| 无码人妻丰满熟妇奶水区码 | 久热亚洲精品一区二区| 日韩手机在线观看| 午夜无码鲁丝片午夜精品一区二区| 成熟YIN荡美妞A片视频麻豆| av番号网| 99E久热只有精品8在线直播| www国产视频| 日韩不卡AV在线| 国产久热在线观看视频| 人人草人人草| 久草在线草a免费线看| 亚洲一区二区三区四区在线观看| av免费小说| 欧美黄片久久| 亚洲无码三级视频| 亚洲视频在线观看| 亚洲国产精品尤物YW在线观看| 亚洲精品视频观看| 99SE久久爱五月天婷婷 | 人人妻人人玩人人爽| 美女被操爽了| 欧美 日韩 精品| 亚洲无码黄色片| 大地资源免费第二页| 国产三级久久久精品麻豆三级| 国产第一区第二区| 伊人精品影院一本到综合| 国产18精品乱码免费看| 色天使色护士在线视频| 国产精品99久久| 日韩黄色三级| av狼最新网址| 亚洲无码久久久| 日韩黄色精品| 亚洲 欧美 小说 国产 图片| 久热国产精品视频一区二区三区 | 最近免费中文字幕MV在线电影| 免费无遮挡无码永久视频| 日本欧美黄色片| 97SE亚洲精品一区| 欧美在线不卡| 免费日韩成人电影| 女人十八毛片A级十八女人| 久久久久久毛片免费看| 69黄色片| 丁香色情五月综合网站| 五月丁香激情在线| 久久综合在线| 成人动漫bt种子| 中文日韩在线| 伊人精品综合| 亚洲AV成人精品网站在线播放| 交资源www在线观看| 日韩夫妻性生活| 91日本在线观看亚洲精品| 狠狠干狠狠爱| 综合久久久久久| 国产色精品VR一区二区| 国产一区二区视频在线| 中文无码二区| 一本大道久久久久精品嫩草| 麻花传媒剧国产MV入口在线观看| 精品久久久中文字幕人妻| 精品午夜精品| 图片区 亚洲 在线视频| 亚洲精品国产a久久久久久| AV在线不卡播放| 射18p| 久久久久久一区二区| 国产一区二区三区四区五区| 麻豆影视视频高清在线观看| 麻豆AV久久无码精品久久| 嫩草乱码一区三区四区| 俄罗斯色片| 午夜性啪啪A片免费AAA毛片| 亚洲第一色站| 国产精品无码区| 日本久久久久久久中文字幕| 激情六月丁香| 国产成人精品大尺度在线观看| 操大屁股熟女| 四房播播婷婷基地| 国产精品久久久久久中文字| 无码福利视频| 欧美片第1页 综合| 一区二区三区线日本| 日本精品少妇| 无码av在线免费| 久久视频这里只精品99re8久| 97超碰碰| 午夜伦理福利| 黄色网页免费| 66亚洲一卡2卡3卡四卡新区| 国产精品一区在线| 大地资源中文二页在线观看| 一区二区三区A片无码视频不卡| 91国内精品| 少妇xx| 放荡女邻居11p| 国产精品久久久久久久久久妞妞| 色午夜福利| 在线视频久久只有精| 最好看十大无码AV| 国产精品伦一区二区三级视频| 成人精品综合| 俺来俺去| 欧美在线观看一区二区| 亚洲精品AV无码精品| 国产乱人伦| 亚洲色www| 99久久点在线精品| 麻豆一区二区免费播放网站| 亚洲婷婷在线观看| 婷婷综合一区| 亚洲无AV在线中文字幕| 成人精品国产亚洲AV久久| 日韩在线欧美在线| 亚洲中文字幕日韩精品| 色欲AV久久一区二区三区| 无码毛片A片-区二区三区| 蜜桃视频污| 亚洲区 欧美区| 国产一区在线看| 777精品久无码人妻蜜桃| 99久久久久久久久| 少妇做爰18p极品少妇| 久久亚洲综合色| 八戒八戒午夜A片| 麻豆视传媒视频在线观看| 日韩免费一区| 国产成人无码精品午夜福利A| 亚洲人久久| 人妻无码AV波多野结衣| 无码日本大胆XXXX| 人人妻人人澡人人爽精品| 日本久久一区| 丁香花大型社区| 99久久精品费精品国产| 一色屋精品亚洲香蕉网站| 超碰人妻免费| 精品人妻无码一区二区三区不卡| 四虎成人网址| 99久RE热视频这里只有精品6| 日本一卡二卡新区入口| av网站网址| 国产黄色免费看| 欧美三级欧美一级| 插插插av| 五月综合视频| 欧美日韩91| 中文字幕乱码人妻二区三区| 国产成人无码精品久久一区二区| 色综合啪啪| 久久久久9999妇女| 国产精品久久久99| 五月婷婷一区| 欧美牲交A欧美牲交| 精品欧美| 久久亚洲激情| 日韩少妇精品| 成人国产精品久久| 亚洲无码人妻一区二区三区| 日本高清黄色| 亚洲愉拍99热成人精品| 好青青在线视频观看视频| www99热| 久久久久久久综合色一本| 国产成人AV免费在线观看| 高清无码91| 午夜精品亚洲| 久久精品国产亚洲AV麻豆| 久草香蕉依人在线| 麻豆视传媒官方短视频网站| 91精品人妻一区二区三区蜜臀| 亚洲激情视频在线观看| 毛片久久久久久| 大香蕉内射| 亚洲国产欧美在线另类| 伊人网视频| 日韩av在线影院| 91网站 精品| 久久99久久久久| 日韩精品无码A片一二三区| 大地资源第二页在线观看完整版 | 无码乱人伦一区二区亚洲一| 亚洲午夜精品A片久久WWW解说 | 色综合www| 欧美亚洲国产成人一区二区三区 | 丁香五月在线观看| 男人的天堂一区二区三区| 99日韩精品| 99鲁鲁精品一区二区三区| 亚洲性小说| 无码乱人伦一区二区亚洲| 99re最新在线精品| 最近2018最新中文字幕免费看| 国产真实夫妇4P交换A片| 99久久99久久精品国产片桃花| 国产精品久久中文字幕| 中文字幕一区二区三区日韩精品| 深爱激情五月丁香| 99re6在线视频| 亚洲の无码国产の无码步美| 粉嫩AV一区二区三区四区在线不卡| 99久久人妻精品无码二区| sky angel vol.66| AV蜜臀在线网站| 97人伦影院A片在线观看| 日日精品| 99久久精品日本一区二区免费| 少妇人妻偷人精品视蜜桃| 亚洲精品视频久久| 美女自慰影院| 狠狠操伊人| 色色综合色色| 丁香五月天综合| 日本三级少妇三级99| 91AV电影| 1024国产精品| 四虎影视永久无码精品| 久热国产精品视频一区二区三区| 欧美阿v高清资源不卡在线播放| 日韩在线免费观看视频| MD传媒免费进入在线观看| 精品一区二区三区AV天堂| 久久精品AV麻豆| 久久a视频| 日韩一区二区三区久久| freehd人妻少妇xxxx| 久久青青视频| 国产av一区二区三区| 青青草97国产精品免费观看| 日韩视频免费观看| 国产伦精品一区二区三区精品| 在线看黄色av| 亚洲综合无码一区二区毛片| 国产精品爱| 97精品视频在线观看| 喷水高潮视频| 亚洲AV精| 日韩五十路| 国产精品久久99精品国产| 伊人丁香| 内射中文字幕| 无码人妻黑人中文字幕| 日韩福利一区二区| 中文人妻无码一区二区三区| 四虎影视网| 久久久久亚洲| 色综合久久天天综合网| 欧美日韩人妻| 亚洲无码午夜福利| 亚洲情侣在线| 中文人妻无码| 日韩啪啪视频| 亚洲AV成人一区二区三区啪啪| 无码人妻精品一区二区蜜桃视频| 日韩AV爽爽爽久久久久久| 2017无毒的黄网网址| 欧美人人爽| 尤物网站在线观看| 成人久久精品| 最新久久久| 日韩午夜在线观看| 久久e| 国产人妻无码一区二区三区不卡| 午夜蜜桃视频| 国产精品99久久久久久久医生| 少妇福利导航| 久久精品视频99| 黄色av无码在线观看| 欧美黄色精品| 中文字幕精品一区二区三区精品| 天天人人精品| www.四虎.com| 懂色一区二区三区免费观看| 亚洲精品第一页| 大香线蕉视频在线观看6| 国产精品自在拍首页视频8| 野草一二三乱码区地址| 精品一卡2卡三卡4卡乱码理论| ls视频app深夜福利| 黑人性爽XXXX性爽XYX| 亚洲AV无码成人毛片| 午夜福利大全| 97在线观看免费视频| 熟女专场88av| 国产成人精品一区二区| 超碰地址| 人妻中文无码| 97国产在线| 丁香五月激情六月| 精品久久久久久无码不卡| 高清欧美性猛交xxxx黑人猛交| 大地影视官网第二页入口在线观看| 欧美日韩在99线| 精品国产一区二区三区四区阿崩 | xxx粗大长欧美| 亚洲最大成人视频| 黄片在线视频免费观看| 日韩中文字幕在线看| 亚洲国产精品免费| 亚洲AV无码国产毛片久久春色| 狠狠做深爱婷婷久久综合一区 | 伊人久久大香色综合| 精品国产三级| 在线播放无码后入内射少妇 | 成人一级黄色片| 国产午夜福利在线视频| 欧美亚洲第一区| 久久国产亚洲精品| 99热久久爱五月天婷婷| WWW亚洲精品久久久无码| 999久久国产精品免费人妻| 中文字日产幕乱五区| 国产成人精品午夜动态图| 日韩欧美中文字幕综合| 久九九| 四虎黄色影院| 日本猛少妇色xxxxx猛叫| 麻豆视传媒入口| 最好看的中文字幕国语2019| 你懂的国产精品| 久久高潮视频| 日韩AV成人网| 91高清在线| 亚洲宗合| 99re最新在线精品| 国产AV一区二区三区日韩| 国产性高潮| 国产午夜精品福利| 婷婷五月丁香综合| 中文精品无码中文字幕无码专区 | 午夜福利小电影| 久久网伊人| 亚洲福利电影| 国产综合自拍| 成年人深夜福利| 久久日本精品在线热| 日韩欧美啪啪| av你懂的| 婷婷在线视频| 国产综合精品一区二区三区| 成人精品国产亚洲AV久久| 2019爱久久视频在线播放| 野一外一性一交一视频| 欧美伊人在线| 国产精产国品一二三产区| 国产一区二区三区中文字幕| 欧美精品久久久久久久小说| 久久久免费看少妇高潮A片18禁| 国产黄色三级片视频| 国产精品水嫩水嫩| 丰满少妇一区二区三区专区| 97伦伦午夜电影理伦片| 欧美一区二区三区激情视频 | 人妻无码AV久久一二三区| 日本三级韩国三级99久久| 国产欧美一区二区三区ok影院| 午夜影院试看五分钟| 91麻豆精品国产91久久久久久| 日韩精品区一区二区三VR| 国产亚洲精品久久久久久郑州| 国产精品人妻无码免费久久久| 免费在线观看一区二区三区| AV一二三四区| MD豆传媒一二三区入口| 亚洲精品AV中文字幕在线| 人人大香蕉| 欧美乱子伦| 久久露脸国语精品国产91| 亚洲 综合 图文 偷拍| 亚洲av色色| 中文字幕一区二区三三| 东京热无码视频| 麻豆传煤官网APP免费入口| 日韩欧美中文字幕一区| 99久久国产精| 亚洲无码在线一区二区三区| 激情综合激情五月| 成全电影免费看| 久久电影一区| 丝袜五月天| 亚洲欧美日韩国产成人精品影院| 麻豆视传媒APP官方网站入口| 四虎永久在线精品国产免费| 日本欧美一区二区三区不卡视频| 日本久久一区| 巨熟乳波霸a∨田中瞳| 国语自产精品视频在线看| 午夜片欧美伦+欧美大片| 亚洲在线看片| 日韩无码人妻| 无码人妻丰满熟妇A片护士M| 香港三日本三级少妇99| 精品电影一区二区三区| av在线天堂| 中韩欧a无线码| 黄片线上看| 免费看无码| 国产 欧美 亚洲 中文字幕| 久久这里只有精品2| av毛片免费| 亚洲欧美日韩国产成人精品影院| 人与人和人与物XXX| 麻豆传媒视频免费在线观看| 女人高潮喷水视频| 久久久新| 午夜影院顶级大片| 91国在线啪| 国产乱乱| 国产欧洲一卡2卡3卡4卡| 无码精品人妻一区| 亚洲一区二区三区精品视频| 国产少妇| 国产色精品VR一区二区| 最新av网| 91在线欧美| 亚洲 综合 图文 偷拍| 无码在线免费观看| 少妇激情一区二区三区视频| 麻豆榴莲茄子草莓丝瓜富二代| 蜜臀av性久久久久av蜜臀三区| 啪啪啪啪网| 久久精品国产亚洲AV麻豆蜜芽| 青久视频| 有码在线播放| 久久精品人人做人人爽| 大地资源高清在线观看| 天天视频免费入口| 亚洲爆乳无码| 67194成人手机在线| 日本三级日本三级少妇上三加您亚 | 激情av在线播放|