山東電纜橋架安裝施工要求及規(guī)范

  電纜橋架在我國(guó)的應(yīng)用只有十多年,在歐美發(fā)達(dá)也不過(guò)是幾十年。在一個(gè)機(jī)房項(xiàng)目中,比起造價(jià)昂貴、高科技的硬件和軟件,橋架顯的很不起眼,也很少為人關(guān)注,但它卻也是整個(gè)布線(xiàn)工程中不可缺少的部分。那么在施工中電纜橋架安裝施工要求及規(guī)范怎么樣?

  The application of cable trays in China has only been more than ten years, and in developed countries in Europe and America, it is only a few decades. In a computer room project, compared to expensive and high-tech hardware and software, cable trays may appear inconspicuous and receive little attention, but they are still an indispensable part of the entire cabling project. So what are the requirements and standards for the installation of cable trays during construction?base64_image

  1 一般規(guī)定  1.1本章適用于電壓為10KV及以下新建擴(kuò)建的一般工業(yè)與民用建筑電纜、橋架安裝和橋架內(nèi)電纜敷設(shè)

  1 General Provisions 1.1 This chapter applies to the installation of cables, cable trays, and cable laying inside cable trays for newly constructed and expanded general industrial and civil buildings with a voltage of 10KV or below

  1.2電纜橋架安裝和橋架內(nèi)電纜敷設(shè),應(yīng)按已批準(zhǔn)的設(shè)計(jì)文件施工。

  1.2 The installation of cable trays and the laying of cables inside the trays shall be carried out in accordance with the approved design documents.

  1.3由支、吊、托架支撐的托盤(pán)(槽)或梯架直線(xiàn)段、彎通非直線(xiàn)段組合而成,敷設(shè)電纜具有連續(xù)性的剛性結(jié)構(gòu)系統(tǒng),為電纜橋架。見(jiàn)圖1.3

  1.3 A rigid structural system consisting of trays (troughs) or ladder straight sections and curved non straight sections supported by supports, hangers, and brackets, with continuous cable laying, is called a cable tray. Refer to Figure 1.3

  1.4 金屬電纜橋架及其支架和引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)定:

  1.4 Metal cable trays and their supports, as well as metal cable conduits introduced or led out, must be reliably grounded (PE) or grounded (PEN), and must comply with the following regulations:

  1.4.1金屬電纜橋架及支架全長(zhǎng)應(yīng)不少于2處與接地(PE)或接零(PEN)干線(xiàn)相連接;

  1.4.1 The total length of metal cable trays and supports should be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points;

  1.4.2非鍍鋅電纜橋架間連接板的兩端跨接線(xiàn)銅芯接地線(xiàn),接地線(xiàn)小允許截面積不小于4mm2;

  1.4.2 Copper core grounding wire for the two ends of the connecting plate between non galvanized cable trays, with a minimum allowable cross-sectional area of not less than 4mm2 for the grounding wire;

  1.4.3鍍鋅電纜橋架間連接板的兩端不跨接接地線(xiàn),但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  1.4.3 The two ends of the connecting plate between galvanized cable trays shall not be connected to the grounding wire, but there shall be no less than 2 connection fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  1.4.5電纜敷設(shè)嚴(yán)禁有絞擰、鎧裝壓扁、護(hù)層斷裂和表面嚴(yán)重劃傷等缺陷。

  1.4.5 Cable laying must strictly prohibit defects such as twisting, flattening of armor, breakage of protective layer, and severe surface scratches.

  1.4.6電纜橋架處如有防火要求的場(chǎng)所,應(yīng)采取防火隔離措施。

  If there are fire prevention requirements at the cable tray location, fire isolation measures should be taken.

  2 施工準(zhǔn)備

  2. Construction preparation

  2.1 技術(shù)準(zhǔn)備:

  2.1 Technical Preparation:

  2.1.1按照已批準(zhǔn)的施工組織設(shè)計(jì)(施工方案)進(jìn)行技術(shù)、交底。

  2.1.1 Conduct technical and safety briefings in accordance with the approved construction organization design (construction plan).

  2.1.2 施工執(zhí)行工藝標(biāo)準(zhǔn)、圖集、規(guī)范齊全。

  2.1.2 The construction execution process standards, drawings, and specifications are complete.

  2.1.3電纜橋架敷設(shè)前,應(yīng)檢查橋架敷設(shè)有無(wú)與其他設(shè)備、管線(xiàn)交叉或重疊無(wú)法施工的地方,施工前應(yīng)與各工種、監(jiān)理或建設(shè)單位及設(shè)計(jì)單位協(xié)商好,并作好記錄,以保證施工順利進(jìn)行。

  Before laying cable trays, it is necessary to check whether there are any areas where the tray crosses or overlaps with other equipment or pipelines that cannot be constructed. Prior to construction, it is necessary to consult with various trades, supervisors, construction units, and design units, and make records to ensure smooth construction.

  2.1.4根據(jù)施工圖或施工所用電纜應(yīng)作好電纜牽引力的計(jì)算。

  2.1.4 According to the construction drawings or the cables used for construction, the calculation of cable traction force should be carried out.

  1.電纜橋架規(guī)格及型號(hào)必須符合設(shè)計(jì)要求,附件齊全;橋架與配件、附件和緊固件各種型鋼均應(yīng)采用鍍鋅標(biāo)準(zhǔn)件。

  1. The specifications and models of cable trays must meet the design requirements, and all accessories must be complete; All types of steel for cable trays, accessories, attachments, and fasteners should use galvanized standard parts.

  2.各種規(guī)格電纜橋架的直線(xiàn)段、彎通、橋架附件及支、吊架立柱及型鋼等有產(chǎn)品合格證,橋架內(nèi)外應(yīng)光滑平整,無(wú)棱刺,不應(yīng)有扭曲翹邊等變形現(xiàn)象。

  2. The straight sections, bends, accessories, supports, hangers, columns, and steel sections of various specifications of cable trays should have product certification. The inside and outside of the tray should be smooth and flat, without edges or burrs, and there should be no distortion or warping.

  3.橋架訂貨或制作應(yīng)按設(shè)計(jì)要求進(jìn)行,不應(yīng)有誤,應(yīng)反復(fù)校核以免造成浪費(fèi)。

  3. The ordering or production of cable trays should be carried out according to the design requirements, without errors, and should be repeatedly checked to avoid waste.

  4.橋架安裝選擇需屏蔽電氣干擾的電纜回路,有腐蝕的場(chǎng)所、易燃粉塵場(chǎng)所,應(yīng)選用無(wú)蓋無(wú)孔封閉型托盤(pán),當(dāng)需要因地制宜的場(chǎng)所,宜選用組裝式托盤(pán)或有孔托盤(pán)及梯架;在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所,宜帶有蓋板。低壓電力電纜與控制電纜共用同一托盤(pán)或梯架時(shí),應(yīng)選用中間有隔板的托盤(pán)或梯架;在托盤(pán)、梯架分支、引上、引下處應(yīng)設(shè)適當(dāng)?shù)膹澩ǎ灰蚴芸臻g條件限制不便裝設(shè)彎通或有特殊要求時(shí),可選用軟連接板,鉸接板;伸縮縫應(yīng)設(shè)置伸縮板;連接兩段不同寬度或高度的托盤(pán)、梯架可配置變寬或變高板。但在施工中,支、吊架和橋架的選擇應(yīng)依設(shè)計(jì)或工程布置條件選擇。

  4. When installing cable trays, cable circuits that need to be shielded from electrical interference should be selected. In places with corrosion and flammable dust, uncovered and non perforated enclosed trays should be used. When suitable for local conditions, assembled trays or perforated trays and ladders should be selected; In environments or outdoor places that are prone to dust accumulation and require cover, it is advisable to have a cover plate. When low-voltage power cables and control cables share the same tray or ladder, a tray or ladder with a partition in the middle should be selected; Appropriate bends should be installed at the branching, leading up, and leading down points of pallets and ladders; When it is not convenient to install bends due to space constraints or there are special requirements, soft connecting plates and hinged plates can be used; Expansion joints should be equipped with expansion plates; Connecting two trays or ladders of different widths or heights can be configured with variable width or height boards. However, during construction, the selection of supports, hangers, and cable trays should be based on the design or engineering layout conditions.

  5.托盤(pán)、梯架的寬和高度,應(yīng)按下列要求選擇:

  5. The width and height of pallets and ladders should be selected according to the following requirements:

  (1)電纜在橋架內(nèi)的填充率,電力電纜不應(yīng)大于40%;控制電纜不應(yīng)大于50%。并應(yīng)留有一定的備用空位,以便今后為增添電纜用;

  (1) The filling rate of cables in cable trays should not exceed 40% for power cables; The control cable should not exceed 50%. And there should be some spare space left for future cable additions;

  (2)所選托盤(pán)、橋架規(guī)格的承載能力應(yīng)滿(mǎn)足規(guī)定。其工作均布荷載不應(yīng)大于所選托盤(pán)、梯架荷載等級(jí)的額定均布荷載;

  (2) The bearing capacity of the selected tray and bridge specifications should meet the requirements. The uniformly distributed load of its work should not exceed the rated uniformly distributed load of the selected pallet and ladder load level;

  (3)工作均布荷載下的相對(duì)撓度不宜大于1/200。

  (3) The relative deflection under uniformly distributed load should not exceed 1/200.

  托盤(pán)、梯架直線(xiàn)段,可按單件標(biāo)準(zhǔn)長(zhǎng)度選擇。單件標(biāo)準(zhǔn)長(zhǎng)度一般規(guī)定為2、3、4、6m。托盤(pán)、梯架的寬度與高度常用規(guī)格尺寸系列如表2.4-1

  Tray and ladder straight sections can be selected according to the standard length of a single piece. The standard length of a single piece is generally specified as 2, 3, 4, and 6 meters. The commonly used specifications and dimension series for the width and height of pallets and ladders are shown in Table 2.4-1

  注:符號(hào)△表示常用規(guī)格。

  Note: The symbol △ represents commonly used specifications.

  各類(lèi)彎通及附件規(guī)格,應(yīng)適合工程布置條件,并與托盤(pán)、梯架配套。

  All types of bends and accessory specifications should be suitable for the engineering layout conditions and matched with pallets and ladders.

  支、吊架規(guī)格選擇,應(yīng)按托盤(pán)、梯架規(guī)格層數(shù)、跨距等條件配置,并應(yīng)滿(mǎn)足荷載的要求。

  The selection of support and hanger specifications should be based on the number of layers, span, and other conditions of the pallet and ladder, and should meet the requirements of the load.

  鋼制橋架的表面處理方式,應(yīng)按工程環(huán)境條件、重要性、耐久性和技術(shù)經(jīng)濟(jì)性等因素進(jìn)行選擇。一般情況宜按表2.4-2選擇適用工程環(huán)境條件的防腐處理方式。當(dāng)采用表中“T”類(lèi)防腐方式為鍍鋅鎳合金、高純化等其它防腐處理的橋架,應(yīng)按規(guī)定試驗(yàn)驗(yàn)證,并應(yīng)具有明確的技術(shù)質(zhì)量指標(biāo)及檢測(cè)方式。

  The surface treatment method for steel cable trays should be selected based on factors such as engineering environmental conditions, importance, durability, and technical economy. Generally, it is advisable to choose the anti-corrosion treatment method that is suitable for the engineering environmental conditions according to Table 2.4-2. When using the "T" anti-corrosion method in the table, such as galvanized nickel alloy, high-purity or other anti-corrosion treatments, the bridge should be tested and verified according to regulations, and should have clear technical quality indicators and testing methods.

  注:符號(hào)“○”表示防腐類(lèi)別。

  Note: The symbol "○" indicates the recommended anti-corrosion category.

  6.橋架的外觀(guān)檢查

  6. Appearance inspection of bridge frame

  橋架產(chǎn)品包裝箱內(nèi)應(yīng)有裝箱清單、產(chǎn)品合格證及出廠(chǎng)檢驗(yàn)報(bào)告。托盤(pán)、梯架板材厚度應(yīng)滿(mǎn)足表2.6的規(guī)定。表面防腐層材料應(yīng)符合現(xiàn)行有關(guān)標(biāo)準(zhǔn)的規(guī)定。

  The packaging box for bridge products should include a packing list, product certification, and factory inspection report. The thickness of pallets and ladder boards should meet the requirements of Table 2.6. The surface anti-corrosion coating material should comply with the relevant national standards currently in effect.

  熱浸鍍鋅的托盤(pán)、橋架鍍層表面應(yīng)均勻,無(wú)毛刺、過(guò)燒、掛灰、傷痕、局部未鍍鋅(直徑2mm以上)等缺陷,不得有影響安裝的鋅瘤。螺紋的鍍層應(yīng)光滑,螺栓連接件應(yīng)能擰入。

  The surface of hot-dip galvanized trays and cable trays should be uniform, without defects such as burrs, overburning, hanging dust, scars, and partial non galvanizing (diameter of 2mm or more), and there should be no zinc nodules that affect installation. The coating of the thread should be smooth, and the bolt connection should be able to be screwed in.

  電鍍鋅的鋅層表面應(yīng)光滑均勻,致密。不得有起皮、氣泡、花斑、局部未鍍、劃傷等缺陷。

  The surface of the zinc layer of electroplated zinc should be smooth, uniform, and dense. There shall be no defects such as peeling, bubbles, flower spots, partial uncoated areas, scratches, etc.

  噴涂應(yīng)平整、光滑、均勻、不起皮、無(wú)氣泡水泡。

  The spraying should be smooth, even, without peeling or bubbles.

  橋架焊縫表面均勻,不得有漏焊、裂紋、夾渣、燒穿、弧坑等缺陷。

  The surface of the bridge welding seam should be uniform and free of defects such as missed welding, cracks, slag inclusion, burn through, arc craters, etc.

  橋架螺栓孔徑,在螺桿直徑不大于M16時(shí),可比螺桿直徑大2mm。

  The hole diameter of the bridge bolt can be 2mm larger than the screw diameter when the screw diameter is not greater than M16.

  螺栓連接孔的孔距允許偏差:同一組內(nèi)相鄰兩孔間距±0.7mm,同一組內(nèi)任意兩孔間距±1mm;相鄰兩組的端孔間距±1.2mm。

  The allowable deviation for the distance between bolt connection holes is: the distance between adjacent holes in the same group is ± 0.7mm, the distance between any two holes in the same group is ± 1mm, and the distance between end holes in adjacent groups is ± 1.2mm.

  7.膨脹螺栓:應(yīng)根據(jù)允許拉力和剪力進(jìn)行選擇;可按計(jì)劃驗(yàn)收,絲扣應(yīng)完好無(wú)損。

  7. Expansion bolts: should be selected based on allowable tensile and shear forces; The inspection can be carried out according to the plan, and the thread should be intact and undamaged.

  8.電纜應(yīng)有合格證和“CCC”認(rèn)證標(biāo)志,并應(yīng)有“CCC”認(rèn)證復(fù)印件;每盤(pán)電纜上應(yīng)標(biāo)明規(guī)格、型號(hào)、電壓等級(jí)、長(zhǎng)度及出廠(chǎng)日期電纜相應(yīng)完好無(wú)損。

  8. The cable should have a certificate of conformity and the "CCC" certification mark, and should have a copy of the "CCC" certification; Each cable reel should indicate the specifications, model, voltage level, length, and date of manufacture, and the cable should be intact and undamaged accordingly.

  9.電纜外觀(guān)完好無(wú)損,鎧裝無(wú)銹蝕、無(wú)機(jī)械操作,無(wú)皺折和扭曲現(xiàn)象。油浸電纜應(yīng)密封良好,無(wú)漏油及滲油現(xiàn)象。橡套及塑料電纜外皮及絕緣層無(wú)老化及裂紋。電纜端頭密封良好。

  9. The appearance of the cable is intact and undamaged, the armor is not corroded, there is no mechanical operation, and there is no wrinkling or twisting phenomenon. Oil immersed cables should be well sealed without oil leakage or seepage. The rubber sleeve and plastic cable sheath and insulation layer have no aging or cracks. The cable end is well sealed.

  10.其它附屬材料;電纜標(biāo)示牌、油漆、汽油、封鉛、硬脂酸白布帶、橡皮包布、黑包布、塑料絕緣帶等均應(yīng)符合要求

  10. Other ancillary materials; Cable signs, paint, gasoline, lead sealing, stearic acid white cloth tape, rubber wrap, black wrap, plastic insulation tape, etc. should all meet the requirements

  3 施工工藝

  3 Construction Techniques

  3.1 電纜橋架安裝施工工藝

  3.1 Construction process for cable tray installation

  3.1.1電纜橋架安裝工藝流程:

  3.1.1 Cable tray installation process:

  定位放線(xiàn)→預(yù)埋鐵件或膨脹螺栓→支、吊、托架安裝→橋架安裝→保護(hù)接地安裝

  Positioning and laying out → Pre embedded iron parts or expansion bolts → Installation of supports, hangers, and brackets → Installation of cable trays → Installation of protective grounding

  3.1.2根據(jù)施工圖確定始端到終端位置,沿圖紙標(biāo)定走向,找好水平、垂直、彎通,用粉線(xiàn)袋或畫(huà)線(xiàn)沿橋架走向在墻壁、頂棚、地面、梁、板、柱等處彈線(xiàn)或畫(huà)線(xiàn),并均勻檔距畫(huà)出支、吊、托架位置。

  3.1.2 Determine the starting and ending positions according to the construction drawing, mark the direction along the drawing, find the horizontal, vertical, and curved lines, use a powder line bag or draw lines along the bridge direction to snap or draw lines on walls, ceilings, floors, beams, slabs, columns, etc., and draw the positions of supports, hangers, and brackets evenly spaced.

  3.1.3預(yù)埋鐵件或膨脹螺栓

  3.1.3 Pre embedded iron parts or expansion bolts

  (1) 預(yù)埋鐵件的自制加工不應(yīng)小于120mm×80mm×6mm,做法如本標(biāo)準(zhǔn)6.3.7.2圖6.3.7.2。其錨固圓鋼的直徑不小于10mm。

  (1) The self-made processing of embedded iron parts should not be less than 120mm × 80mm × 6mm, as shown in Figure 6.3.7.2 of this standard. The diameter of the anchored round steel shall not be less than 10mm.

  (2) 緊密配合土建結(jié)構(gòu)的施工,將預(yù)埋鐵件平面緊貼模板,將錨固圓鋼用綁扎或焊接的方法固定在結(jié)構(gòu)內(nèi)的鋼筋上;待混凝土模板拆除后,預(yù)埋鐵件平面外露,將支架、吊架或托架焊接在上面進(jìn)行固定。

  (2) Closely cooperate with the construction of civil engineering structures, tightly adhere the embedded iron parts to the formwork, and fix the anchoring round steel to the steel bars inside the structure by binding or welding; After the concrete formwork is removed, the embedded iron parts should be exposed on the surface, and the brackets, hangers or brackets should be welded on top for fixation.

  (3) 根據(jù)支架承受的荷重,選擇相應(yīng)的膨脹螺栓及鉆頭;埋好螺栓后,可用螺母配上相應(yīng)的墊圈將支架或吊架直接固定在金屬膨脹螺栓上,可參見(jiàn)本標(biāo)準(zhǔn)6.3.7.7圖表。

  (3) Select the corresponding expansion bolts and drill bits based on the load borne by the bracket; After burying the bolts, the bracket or hanger can be directly fixed to the metal expansion bolt with nuts and corresponding washers, as shown in Figure 6.3.7.7 of this standard.

  4.支、吊架安裝

  4. Installation of supports and hangers

  (1) 支架與吊架所用鋼材應(yīng)平直,無(wú)顯著扭曲。下料后長(zhǎng)短偏差應(yīng)在3mm范圍內(nèi),切口處應(yīng)無(wú)卷邊、毛刺;

  (1) The steel used for brackets and hangers should be straight and free from significant distortion. The length deviation after cutting should be within 3mm, and there should be no curled edges or burrs at the incision;

  (2) 鋼支架與吊架應(yīng)焊接牢固,無(wú)顯著變形,焊接前厚度超過(guò)4mm的支架、鐵件應(yīng)打坡口,焊縫均勻平整,焊縫長(zhǎng)度應(yīng)符合要求,不得出現(xiàn)裂紋、咬邊、氣孔、凹陷、漏焊等缺陷;

  (2) Steel brackets and hangers should be welded firmly without significant deformation. Brackets and iron parts with a thickness exceeding 4mm before welding should be chamfered, and the weld seam should be uniform and smooth. The weld seam length should meet the requirements and should not have defects such as cracks, undercutting, porosity, indentation, or missed welding;

  (3)支架與吊架應(yīng)安裝牢固,保證橫平豎直,在有坡度的建筑物上安裝支架與吊架應(yīng)與建筑物的坡度、角度一致;

  (3) The brackets and hangers should be installed firmly, ensuring horizontal and vertical alignment. When installing brackets and hangers on buildings with slopes, they should be consistent with the slope and angle of the building;

  支架與吊架的規(guī)格一般不應(yīng)小于扁鋼30mm×3mm;角鋼25mm×25mm×3mm;

  The specifications of brackets and hangers should generally not be less than 30mm × 3mm for flat steel and 25mm × 25mm × 3mm for angle steel;

 ?。?)嚴(yán)禁用電氣焊切割鋼結(jié)構(gòu)或輕鋼龍骨任何部位;

  (5) It is strictly prohibited to use electrical welding to cut any part of steel structures or light steel joists;

 ?。?)吊具應(yīng)采用定型產(chǎn)品,并應(yīng)有各自獨(dú)立的吊裝卡具或支撐系統(tǒng)。

  (6) Universal lifting devices should use standardized products and have their own independent lifting fixtures or support systems.

 ?。?)固定支點(diǎn)間距一般不應(yīng)大于1.5~2m。在進(jìn)出接線(xiàn)盒、箱、柜、轉(zhuǎn)角、轉(zhuǎn)彎和變形縫兩端及丁字接頭的三端500mm以?xún)?nèi)應(yīng)設(shè)固定支持點(diǎn)。

  (7) The distance between fixed support points should generally not exceed 1.5-2m. Fixed support points should be set within 500mm at both ends of the entrance and exit junction boxes, boxes, cabinets, corners, bends, and deformation joints, as well as at the three ends of the T-shaped joint.

 ?。?)嚴(yán)禁用木磚固定支架與吊架。

  (8) It is strictly prohibited to use wooden bricks to fix brackets and hangers.

  5.橋架安裝

  5. Bridge installation

  (1) 電纜橋架水平敷設(shè)時(shí),支撐跨距一般為1.5~3m,電纜橋架垂直敷設(shè)時(shí)固定點(diǎn)間距不宜大于2m。橋架彎通彎曲半徑不大于300mm時(shí),應(yīng)在距彎曲段與直線(xiàn)段結(jié)合處300~600mm的直線(xiàn)段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)彎曲半徑大于300mm時(shí),還應(yīng)在彎通中部增設(shè)一個(gè)支、吊架。支、吊架和橋架安裝必須考慮電纜敷設(shè)彎曲半徑滿(mǎn)足規(guī)范小彎曲半徑。見(jiàn)表3.1.5。

  (1) When laying cable trays horizontally, the support span is generally 1.5-3m. When laying cable trays vertically, the spacing between fixed points should not exceed 2m. When the bending radius of the tray is not greater than 300mm, a support or hanger should be set on the side of the straight section 300-600mm away from the junction of the curved section and the straight section. When the bending radius is greater than 300mm, a support or hanger should be added in the middle of the bend. The installation of supports, hangers, and cable trays must consider that the bending radius of cable laying meets the minimum bending radius specified in the specifications. See Table 3.1.5.

  注為電纜外徑。

  Note the outer diameter of the cable.

  (2)門(mén)型角鋼支架的安裝:梯型橋架沿墻垂直敷設(shè),可使用門(mén)型角鋼支架,支架的固定應(yīng)盡可能配合土建施工預(yù)埋。如圖3.1.5(2-1),也可在土建施工中預(yù)埋開(kāi)角螺栓,用開(kāi)角螺栓固定支架如圖3.1.5(2-1),也可以采用膨脹螺栓固定。

  (2) Installation of door type angle steel bracket: The ladder type bridge is vertically laid along the wall, and door type angle steel bracket can be used. The fixation of the bracket should be embedded as much as possible in conjunction with civil construction. As shown in Figure 3.1.5 (2-1), angle bolts can also be pre embedded in civil construction to fix the bracket as shown in Figure 3.1.5 (2-1), or expansion bolts can be used for fixation.

  圖3.1.5.(2-1) 角鋼支架預(yù)埋安裝

  Figure 3.1.5. (2-1) Pre embedded installation of angle steel bracket

  圖3.1.5.(2-2) 鋼支架預(yù)埋地腳螺栓安裝

  Figure 3.1.5. (2-2) Installation of pre embedded anchor bolts for steel supports

  (3)梯型角鋼支架的安裝:橋架沿墻、柱水平安裝時(shí),托壁需安裝在異型鋼立柱上,而立柱要安裝在梯型角鋼支架上,使柱和墻上的橋架固定支架(或托臂)在同一條直線(xiàn)上。制作見(jiàn)圖和表3.1.5(3)底架與門(mén)型架焊接時(shí),焊角高度5mm。

  (3) Installation of ladder type angle steel bracket: When the bridge is installed horizontally along the wall or column, the support wall needs to be installed on the special-shaped steel column, and the column needs to be installed on the ladder type angle steel bracket, so that the fixed bracket (or support arm) of the column and the bridge on the wall are in the same straight line. When welding the chassis and door frame as shown in Figure 3.1.5 (3), the welding angle height should be 5mm.

  表 3.1.5(3)梯型角鋼支架制作尺寸表(mm)

  Table 3.1.5 (3) Dimensional Table for Manufacturing Ladder Type Angle Steel Supports (mm)

  (4)電纜橋架立柱側(cè)壁式安裝:立柱是直接支承托臂的部件,分工字鋼槽鋼、角鋼、異型鋼立柱;立柱可以在墻上、柱上安裝、也可懸吊在梁板上安裝。做法在混凝土可預(yù)埋鐵件;砌體可砌筑預(yù)制砌塊;也可以采用膨脹螺栓但必須在混凝土強(qiáng)度C20或磚強(qiáng)度在MU10以上的磚砌體上,作法可參照3.1.5(4a、b、c、d、e、f)。

  (4) Side wall installation of cable tray columns: The columns are components that directly support the support arms, and are divided into steel channel steel, angle steel, and special-shaped steel columns; Columns can be installed on walls, columns, or suspended from beams and slabs. The method involves embedding iron components in concrete; Prefabricated masonry blocks can be used for masonry construction; Expansion bolts can also be used, but they must be used on brick masonry with concrete strength C20 or brick strength above MU10. The method can refer to section 3.1.5 (4a, b, c, d, e, f).

  圖3.1.5(4c)異型鋼立柱在墻上側(cè)壁安裝作法之一

  Figure 3.1.5 (4c) One of the installation methods for special-shaped steel columns on the side walls of the wall

  (5)電纜橋架應(yīng)敷設(shè)在易燃易爆氣體管和熱力管道的下方,當(dāng)設(shè)計(jì)無(wú)要求時(shí),與管道的小凈距,符合3.1.5(5)的規(guī)定。

  (5) Cable trays should be laid below flammable and explosive gas pipelines and thermal pipelines. When there are no design requirements, the minimum clear distance from the pipeline should comply with the provisions of 3.1.5 (5).

  表示3.1.5(5)與管道的小凈距

  Indicate the minimum clear distance between 3.1.5 (5) and the pipeline

  6 托臂安裝:

  Installation of Arm 6:

  托臂是直接支承托盤(pán)、梯架單獨(dú)固定的剛性部件,托臂有螺栓固定可預(yù)埋螺栓,也可采用膨脹螺栓,也可卡接,如圖3.1.6(1)、(2)、(3)、(4)、(5)。

  The support arm is a rigid component that directly supports the tray and ladder frame and is fixed separately. The support arm can be fixed with bolts that can be embedded, expansion bolts, or clamped, as shown in Figure 3.1.6 (1), (2), (3), (4), and (5).

  3.2 橋架安裝

  3.2 Bridge installation

  1.直線(xiàn)段鋼制電纜橋架長(zhǎng)度超過(guò)30m,鋁合金或玻璃鋼制電纜橋架長(zhǎng)度超過(guò)15m應(yīng)設(shè)有伸縮節(jié),跨越伸縮縫處設(shè)置補(bǔ)償裝置,可用帶伸縮節(jié)的橋架。

  1. If the length of a straight steel cable tray exceeds 30m, or if the length of an aluminum alloy or fiberglass cable tray exceeds 15m, expansion joints should be installed. Compensation devices should be installed at the expansion joint crossing points, and cable trays with expansion joints can be used.

  2.橋架與支架間螺栓、橋架連接板螺栓緊固無(wú)遺漏,螺母位于橋架外側(cè),當(dāng)鋁合金橋架與鋼支架固定時(shí),有相互間絕緣防電化措施腐蝕措施,一般可墊石棉墊。

  2. The bolts between the bridge and the bracket, as well as the bolts of the bridge connecting plate, are tightened without omission, and the nuts are located on the outside of the bridge. When the aluminum alloy bridge and the steel bracket are fixed, there are mutual insulation and corrosion prevention measures, and asbestos pads can generally be used.

  3.敷設(shè)在豎井內(nèi)和穿越不同防火區(qū)的橋架,應(yīng)按設(shè)計(jì)要求位置,有防火隔離措施,電纜橋架在電氣豎井內(nèi)敷設(shè)可采用角鋼固定,見(jiàn)圖3.1.8。

  3. Cable trays laid in vertical shafts and crossing different fire zones should be located according to design requirements and have fire isolation measures. Cable trays laid in electrical vertical shafts can be fixed with angle steel, as shown in Figure 3.1.8.

  4.電纜橋架在穿過(guò)防火墻及防火樓板時(shí),應(yīng)采取防火隔離措施,防止火災(zāi)沿線(xiàn)路延燃;防火隔離墻、板,應(yīng)配合土建施工預(yù)留洞口,在洞口處預(yù)埋好護(hù)邊角鋼,施工時(shí)根據(jù)電纜敷設(shè)的層數(shù)和根數(shù)用L50×50×5角鋼作固定框,同時(shí)將固定柜焊在護(hù)邊角鋼上;也可以先作好框在土建施工中砌體或澆灌混凝土?xí)r安裝在墻、板中。

  4. When cable trays pass through firewalls and fire-resistant floor slabs, fire-resistant isolation measures should be taken to prevent fires from spreading along the line; Fire isolation walls and panels should be equipped with reserved openings for civil construction, and edge protection angle steel should be pre embedded at the openings. During construction, L50 × 50 × 5 angle steel should be used as a fixed frame according to the number of layers and cables laid, and the fixed cabinet should be welded to the edge protection angle steel; Alternatively, the frame can be installed in the wall or slab during masonry or concrete pouring in civil construction.

  3.3 橋架的接地,當(dāng)設(shè)計(jì)允許利用橋架系統(tǒng)構(gòu)成接地干線(xiàn)回路時(shí),應(yīng)符合下列要求:

  3.3 When the design allows the use of the bridge system to form a grounding main circuit, the grounding of the bridge should meet the following requirements:

  1. 金屬電纜橋架及其支架引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)范:

  1. Metal cable trays and their brackets must have reliable grounding (PE) or neutral (PEN) for the metal cable conduits introduced or led out, and must comply with the following specifications:

  (1) 金屬電纜橋架及其支架全長(zhǎng),與接地(PE)或接零(PEN)干線(xiàn)相連接不小于2處,使整個(gè)橋架為一個(gè)電氣通路。

  (1) The entire length of the metal cable tray and its support shall be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points, making the entire tray an electrical pathway.

  (2) 非鍍鋅電纜橋架間連接的兩端跨接銅芯接地線(xiàn),接地線(xiàn)小允許截面積不小于4mm2。

  (2) The two ends of the non galvanized cable tray are connected with copper core grounding wires, and the minimum allowable cross-sectional area of the grounding wire is not less than 4mm2.

  (3) 鍍鋅電纜橋架間連接板的兩端可不跨接接地線(xiàn),但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  (3) The two ends of the connecting plate between galvanized cable trays may not be connected to the grounding wire, but there shall be no less than 2 fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  2. 盤(pán)、梯架端部之間連接電阻不應(yīng)大于0.00033Ω并應(yīng)用等電位聯(lián)結(jié)測(cè)試儀(導(dǎo)通儀)或微Ω表測(cè)試,測(cè)試應(yīng)在連接點(diǎn)的兩側(cè)進(jìn)行,對(duì)整個(gè)橋架全長(zhǎng)的兩端連接電阻不應(yīng)大于0.5Ω或由設(shè)計(jì)決定,否則應(yīng)增加接地點(diǎn),以滿(mǎn)足要求。接地孔應(yīng)涂層,與涂層接觸的螺栓有一側(cè)的平墊應(yīng)使用帶爪的專(zhuān)用接地墊圈。

  2. The connection resistance between the ends of the tray and ladder should not exceed 0.00033 Ω and should be tested using an equipotential bonding tester (continuity meter) or a micro Ω meter. The test should be conducted on both sides of the connection point, and the connection resistance at both ends of the entire length of the bridge should not exceed 0.5 Ω or be determined by the design. Otherwise, a grounding point should be added to meet the requirements. The grounding hole should eliminate the coating, and the flat pad on one side of the bolt in contact with the coating should use a special grounding washer with claws.

  3. 伸縮縫或軟連接處需采用編織銅線(xiàn)連接。沿橋架全長(zhǎng)另敷設(shè)接地干線(xiàn)時(shí),每段(包括非直線(xiàn)段)托盤(pán)、梯架應(yīng)小有一點(diǎn)與接地干線(xiàn)可靠連接;在接地部位的連接處應(yīng)裝置彈簧墊圈,以免松動(dòng)。

  3. Expansion joints or soft connections should be connected using braided copper wires. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the tray and ladder should be reliably connected to the grounding main line at a small point; A spring washer should be installed at the connection point of the grounding part to prevent loosening.

  電纜橋架作為布線(xiàn)工程的一個(gè)配套項(xiàng)目,目前尚無(wú)專(zhuān)門(mén)的規(guī)范指導(dǎo),個(gè)生產(chǎn)廠(chǎng)家的規(guī)格程式缺乏通用性,因此,設(shè)計(jì)選型過(guò)程應(yīng)根據(jù)弱電各個(gè)系統(tǒng)纜顯得類(lèi)型、數(shù)量,合理選定適用的橋架。(1)確定方向: 根據(jù)建筑平面布置圖,結(jié)合空調(diào)管線(xiàn)和電氣管線(xiàn)等設(shè)置情況、方便維修,以及電纜路由的疏密來(lái)確定電纜橋架的路由。在室內(nèi),盡可能沿建筑物的墻、柱、梁及樓板架設(shè),如許利用綜合管廊架設(shè)時(shí),則應(yīng)在管道一側(cè)或上方平行架設(shè),并考慮引下線(xiàn)和分支線(xiàn)盡量避免交叉,如無(wú)其它管架借用,則需自設(shè)立(支)柱。

  As a supporting project of wiring engineering, there is currently no specialized specification guidance for cable trays, and the specifications and programs of individual manufacturers lack universality. Therefore, the design and selection process should be based on the type and quantity of cables in various weak current systems, and the appropriate cable tray should be selected reasonably. (1) Determine direction: Determine the optimal route for cable trays based on the building layout plan, combined with the installation of air conditioning and electrical pipelines, convenient maintenance, and the density of cable routing. Indoors, try to install along the walls, columns, beams, and floor slabs of the building as much as possible. When using a comprehensive pipe gallery for installation, parallel installation should be carried out on one side or above the pipeline, and consideration should be given to avoiding crossing of down conductors and branch lines as much as possible. If there are no other pipe racks to borrow, self installing (supporting) columns is required.

  (2)荷載計(jì)算:計(jì)算電纜橋架主干線(xiàn)縱斷面上單位長(zhǎng)度的電纜重量。

  (2) Load calculation: Calculate the weight of cables per unit length on the longitudinal section of the main cable tray.

  (3)確定橋架的寬度:根據(jù)布放電纜條數(shù)、電纜直徑及電纜的間距來(lái)確定電纜橋架的型號(hào)、規(guī)格, 托臂的長(zhǎng)度,支柱的長(zhǎng)度、間距,橋架的寬度和層數(shù)。

  (3) Determine the width of the cable tray: Determine the model and specifications of the cable tray, the length of the support arm, the length and spacing of the pillars, the width and number of layers of the cable tray based on the number of cables laid, the diameter of the cables, and the spacing between the cables.

  (4)確定安裝方式:根據(jù)場(chǎng)所的設(shè)置條件確定橋架的固定方式,選擇懸吊式、直立式、側(cè)壁式或是混合式,連接件和緊固件一般是配套供應(yīng)的,此外,根據(jù)橋架結(jié)構(gòu)選折相應(yīng)的蓋板。

  (4) Determine installation method: Determine the fixing method of the bridge according to the setting conditions of the site, choose suspended, upright, side wall or hybrid, and the connectors and fasteners are generally supplied together. In addition, select the corresponding cover plate according to the structure of the bridge.

  (5)繪出電纜橋架平、剖面圖,局部部位還應(yīng)繪出空間圖,開(kāi)列材料表。

  (5) Draw a plan and section diagram of the cable tray, and also draw a spatial diagram of some parts, and list the material list.

  2、如與電力電纜橋架合用時(shí),應(yīng)將電力電纜和弱電電纜各直一側(cè),中間采用隔板分隔。

  2. When used in conjunction with power cable trays, the power cables and weak current cables should be placed on one side each, and separated by a partition in the middle.

  3、弱電電纜與其它低電壓電纜合用橋架時(shí),應(yīng)嚴(yán)格執(zhí)行選擇具有外屏蔽層的弱電系統(tǒng)的弱電電纜,避免相互間的干擾。

  3. When weak current cables are used in cable trays with other low voltage cables, it is necessary to strictly select weak current cables with external shielding layers to avoid interference between them.

  4、電纜橋架安裝要求

  4. Installation requirements for cable trays

  (1)槽式大跨距電纜橋架由室外進(jìn)入建筑物內(nèi)時(shí),橋架向外的坡度不得小于1/100。(2)電纜橋架與用電設(shè)備交越時(shí),其間的凈距不小于0.5m。

  (1) When the trough type large-span cable tray enters the building from the outside, the outward slope of the tray shall not be less than 1/100. (2) When the cable tray intersects with electrical equipment, the clear distance between them shall not be less than 0.5m.

  (3)兩組電纜橋架在同一高度平行敷設(shè)時(shí),其間凈距不小于0.6m。(4)在平行圖上繪出橋架的路由,要注明橋架起點(diǎn)、終點(diǎn)、拐彎點(diǎn)、分支點(diǎn)及升降點(diǎn)的坐標(biāo)或定位尺寸、標(biāo)高,如能繪制橋架敷設(shè)軸側(cè)圖,則對(duì)材料統(tǒng)計(jì)將更精確。

  (3) When two sets of cable trays are laid in parallel at the same height, the clear distance between them should not be less than 0.6m. (4) When drawing the routing of the tray on a parallel diagram, the coordinates or positioning dimensions and elevations of the starting point, ending point, turning point, branching point, and lifting point of the tray should be indicated. If a cable tray laying axis side diagram can be drawn, the material statistics will be more accurate.

  直線(xiàn)段:注明全長(zhǎng)、橋架層數(shù)、標(biāo)高、型號(hào)及規(guī)格。拐彎點(diǎn)和分支點(diǎn):注明所用轉(zhuǎn)彎接板的型號(hào)及規(guī)格。升降段:注明標(biāo)高變化,也可用局部大樣圖或剖面圖表示。

  Straight line segment: indicate the total length, number of bridge layers, elevation, model, and specifications. Turning and branching points: indicate the model and specifications of the turning joint used. Lifting section: indicate the elevation change, and it can also be represented by local detailed drawings or sectional drawings.

  (5)橋架支撐點(diǎn), 如立柱、托臂或非標(biāo)準(zhǔn)支、構(gòu)架的間距、安裝方式、型號(hào)規(guī)格、標(biāo)高,可同意在平面上列表說(shuō)明,也可分段標(biāo)出用不同的剖面圖、單線(xiàn)圖或大樣圖表示。

  (5) The spacing, installation method, model specifications, and elevation of bridge support points, such as columns, brackets, or non-standard supports and structures, can be listed and explained on the plane, or segmented and marked with different sectional drawings, single line drawings, or detailed drawings.

  (6)電纜引下點(diǎn)位置及引下方式,一般而言,大批電纜引下可用垂直彎接板和垂直引上架,少量電纜引下可用導(dǎo)板或引管,注明引下方式即可。

  (6) Generally speaking, for a large number of cable leads, vertical bending plates and vertical lead frames can be used, while for a small number of cable leads, guide plates or guide pipes can be used, indicating the lead method.

  (7)電纜橋架宜高出地面2.2米以上,橋架頂部距頂棚或其它障礙物不應(yīng)小于0.3米,橋架寬度不宜小于0.1米,橋架內(nèi)橫斷面的填充率不應(yīng)超過(guò)50%。

  (7) The cable tray should be at least 2.2 meters above the ground, and the distance between the top of the tray and the ceiling or other obstacles should not be less than 0.3 meters. The width of the tray should not be less than 0.1 meters, and the filling rate of the cross-section inside the tray should not exceed 50%.

  (8)電纜橋架內(nèi)纜線(xiàn)垂直敷設(shè)時(shí),在纜線(xiàn)的上端和每間隔1.5米處應(yīng)固定在橋架的支架上,水平敷設(shè)時(shí), 在纜線(xiàn)的首、尾、轉(zhuǎn)彎及每間隔3~5米處進(jìn)行固定。

  (8) When the cables are vertically laid in the cable tray, they should be fixed on the brackets of the tray at the upper end and every 1.5 meters. When laid horizontally, they should be fixed at the beginning, end, turn, and every 3-5 meters.

  (9)在吊頂內(nèi)設(shè)置時(shí),槽蓋開(kāi)啟面應(yīng)保持80毫米的垂直凈空,線(xiàn)槽截面利用率不應(yīng)超過(guò)50%。

  (9) When installed in the ceiling, the opening surface of the trough cover should maintain a vertical clearance of 80 millimeters, and the utilization rate of the trough section should not exceed 50%.

  (10)布放在線(xiàn)槽的纜線(xiàn)可以不綁扎,槽內(nèi)纜線(xiàn)應(yīng)順直,槽內(nèi)纜線(xiàn)應(yīng)順直,盡量不交叉,纜線(xiàn)不應(yīng)溢出線(xiàn)槽,在纜線(xiàn)進(jìn)出線(xiàn)槽部位, 轉(zhuǎn)彎處應(yīng)綁扎固定。垂直線(xiàn)槽布放纜線(xiàn)應(yīng)每間隔1.5米固定在纜線(xiàn)支架上。

  (10) The cables laid in the cable trough can be left unbound. The cables inside the trough should be straight and straight, avoiding crossing as much as possible. The cables should not overflow from the trough. They should be tied and fixed at the entrance and exit of the trough, as well as at turns. The cables laid in the vertical cable tray should be fixed on the cable support every 1.5 meters.

  (11)在水平、垂直橋架和垂直線(xiàn)槽中敷設(shè)線(xiàn)時(shí),應(yīng)對(duì)纜線(xiàn)進(jìn)行綁扎。4對(duì)線(xiàn)電纜以24根為束,25對(duì)或以上主干線(xiàn)電纜、光纜及其它信號(hào)電纜應(yīng)根據(jù)纜線(xiàn)的類(lèi)型、纜徑、纜線(xiàn)芯數(shù)分束綁扎。綁扎間距不宜大于1.5米,扣間距應(yīng)均勻,松緊適度。

  (11) When laying wires in horizontal and vertical cable trays and vertical trunking, the cables should be tied. 4-pair cables should be bundled with 24 cables, and 25 or more pairs of backbone cables, optical cables, and other signal cables should be bundled and tied according to the type, diameter, and number of cable cores. The binding spacing should not exceed 1.5 meters, the buckle spacing should be uniform, and the tightness should be moderate.

  (12)橋架水平敷設(shè)時(shí),支撐間距一般為1.5-3m,垂直敷設(shè)時(shí)固定在建筑物構(gòu)體上的間距宜小于2m。

  (12) When laying the bridge horizontally, the support spacing is generally 1.5-3m, and when laying vertically, the spacing fixed on the building structure should be less than 2m.

  電纜橋架型式及品種的選擇及鋪設(shè)規(guī)范

  Selection and laying specifications for cable tray types and varieties

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類(lèi)槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected

  2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類(lèi)復(fù)合環(huán)氧樹(shù)脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板。

  2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤(pán)式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板。

  3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  4、在公共通道或戶(hù)外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤(pán) 。大跨距跨越公共通道時(shí),可根據(jù)用戶(hù)要求提高橋架的載荷能力或選用行架。

  4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements.

  5、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶(hù)外要選用復(fù)合環(huán)氧樹(shù)指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、電纜橋架規(guī)格選擇

  2、 Selection of cable tray specifications

  1、復(fù)合環(huán)氧樹(shù)脂電纜橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過(guò)有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量。

  1. The width and height of the composite epoxy resin cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% formula development margin should be reserved.

  2、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套。

  2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame.

  3、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿(mǎn)足荷載的要求。

  3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load.

  4、橋架橫截面積的選擇見(jiàn)表橋架上電纜網(wǎng)絡(luò)中任一線(xiàn)路的自動(dòng)過(guò)電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)0-60 12961-100 258101-200 452201-400 645401-600 968

  4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the cable tray (A). The minimum allowable cross-sectional area of the cable tray (mm2) is 0-60 12961-100 258101-200 452201-400 645401-600 968

  三、對(duì)于電纜橋架的支、吊架的配置

  3、 Configuration of supports and hangers for cable trays

  1、戶(hù)內(nèi)支、吊短跨距一般采取1.5-3m。戶(hù)外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線(xiàn)段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線(xiàn)段與直線(xiàn)結(jié)合處300-600m的直線(xiàn)段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線(xiàn)段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、拉擠玻璃鋼電纜橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of extruded fiberglass cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線(xiàn)段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火:要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。

  4、 Fire prevention: Steel or non combustible and flame-retardant materials must be used in the sections where bridge frames are required to be fire-resistant.

  五、拉擠玻璃鋼電纜橋架的接地

  5、 Grounding of extruded fiberglass cable tray

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線(xiàn)回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線(xiàn)接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線(xiàn)時(shí),每段(包括非直線(xiàn)段)橋架應(yīng)少有一點(diǎn)與接地干線(xiàn)可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容:橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  6、 Bridge system design content: The bridge system engineering design should be closely coordinated with civil engineering, technology, and related disciplines to determine the optimal layout. Its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。2、橋架系統(tǒng)的平面布置圖。3、橋架系統(tǒng)所需直線(xiàn)段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說(shuō)明。4、有特殊要求的非標(biāo)件技術(shù)說(shuō)明或示意圖。

  1. Relevant sectional drawings of the bridge system. 2. Layout plan of the bridge system. 3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations. 4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝:電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》。

  7、 Installation: For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說(shuō)明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠(chǎng)家配齊。4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說(shuō)明或示圖。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements. 4. Non standard technical specifications or diagrams with special requirements.

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類(lèi)槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)   2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類(lèi)復(fù)合環(huán)氧樹(shù)脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板?! ?、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤(pán)式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板。  4、在公共通道或戶(hù)外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤(pán) 。大跨距跨越公共通道時(shí),可根據(jù)用戶(hù)要求提高橋架的載荷能力或選用行架?! ?、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected. 2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements. 5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶(hù)外要選用復(fù)合環(huán)氧樹(shù)指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、規(guī)格選擇

  2、 Specification selection

  1、橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過(guò)有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量?! ?、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套。  3、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿(mǎn)足荷載的要求?! ?、橋架橫截面積的選擇見(jiàn)表   橋架上電纜網(wǎng)絡(luò)中任一線(xiàn)路的自動(dòng)過(guò)電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)   0-60 129   61-100 258   101-200 452   201-400 645   401-600 968

  1. The width and height of the cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% of the formula development margin should be reserved. 2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame. 3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load. 4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the tray (A). The minimum allowable cross-sectional area of the tray (mm2) is 0-60 129 61-100 258 101-200 452 201-400 645 401-600 968

  三、支、吊架的配置

  3、 Configuration of supports and hangers

  1、戶(hù)內(nèi)支、吊短跨距一般采取1.5-3m。戶(hù)外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線(xiàn)段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線(xiàn)段與直線(xiàn)結(jié)合處300-600m的直線(xiàn)段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線(xiàn)段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線(xiàn)段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火

  4、 Fire prevention

  要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。我公司生產(chǎn)的BJⅢ系列電纜橋架均為防火橋架。

  The section requiring bridge fire prevention must be made of steel or non combustible and flame-retardant materials. The BJ III series cable trays produced by our company are all fire-resistant trays.

  五、接地

  5、 Grounding

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線(xiàn)回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線(xiàn)接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線(xiàn)時(shí),每段(包括非直線(xiàn)段)橋架應(yīng)少有一點(diǎn)與接地干線(xiàn)可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容

  6、 Design content of bridge system

  橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  The design of bridge system engineering should be closely coordinated with civil engineering, technology, and relevant disciplines to determine the optimal layout, and its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。

  1. Relevant sectional drawings of the bridge system.

  2、橋架系統(tǒng)的平面布置圖。

  2. Layout plan of the bridge system.

  3、橋架系統(tǒng)所需直線(xiàn)段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說(shuō)明。

  3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations.

  4、有特殊要求的非標(biāo)件技術(shù)說(shuō)明或示意圖。

  4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝

  7、 Installation

  電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》04D701-3。

  For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" 04D701-3 issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說(shuō)明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠(chǎng)家配齊。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements.

  4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說(shuō)明或示圖。

  4. Non standard technical specifications or diagrams with special requirements.

  本文由 濟(jì)南電纜橋架  友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊  http://m.zrbg1.com/  真誠(chéng)的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://m.zrbg1.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Stay tuned

上一篇:濟(jì)南電纜橋架安裝施工要求及規(guī)范
下一篇:濟(jì)南電纜橋架到底需不需要跨接
 
qq
售前咨詢(xún)熱線(xiàn)
15168870138
售后咨詢(xún)熱線(xiàn)
13465410318
精品一区中文字幕| 日韩精品中文字幕一区二区| 麻豆传煤官网APP免费网站在线| 大地影视中文官网免费观看| 手机AV永久免费| 国产精品久久成人毛片麻豆| 毛片基地黄久久久久久天堂| www.久久综合| 日韩黄色电影院| 久久久久久久免费| 亚洲 校园 欧美 国产 另类| 69国产成人网站| 青青久在线视频免费视频| 天天干天天色| 日本黄色不卡视频| 欧美成人一区二区三区四区| 超碰地址| 日韩电影一区| 福利视频一二三在线观看 | 午夜神马福利| AV一二三四| 亚洲无码另类| 91手机看片| 一区二区三区视频在线观看| 首页 图区 国产 亚洲 欧美| 日韩精品一线二线三线| 成人依依| 人妻少妇久久中文字幕一区二区| 久青草视频| 亚洲午夜精品A片一区三区无码| 影音先锋av资源看波波| 狠狠爱亚洲五月婷婷av| 最好看的中文字幕免费大全| 四虎成人午夜影视亚洲精品| 亚洲va欧美va国产va精品| Av一区二区三| 黄片短视频| 亚洲熟女一区二区三区| 国产人妻人伦精品836700| 91在线精品视频| 成人欧美一区二区三区白| 激情五月天色婷婷| 91女同| 欧美一级a一级a爱片免费| 99SE久久爱五月天婷婷| 日韩好片一区二区在线看| 日韩无码tv| 久久久亚洲无码| AV无码高清| 无码日韩视频| 日韩AV综合网| brazzers欧美精品| 欧美性爱视频一区| 亚洲中文字幕AV在线| 超碰97在线播放| 老熟女老女人老熟妇av| 一本大道伊人AV久久乱码| 欧美成人黄色| 亚洲精品一区二区| 人人澡人人澡人人| 国产精品性爱| 亚洲综合久久1区2区3区| 一夲道人妻熟女aⅴ深| 亚洲免费大片| 揄拍成人国产精品视频| 午夜亚洲| 日韩无码一道v| 国产黄色精品视频| 久久久久9999| 在线视频 日韩| 人与人和人与物XXX| 亚洲国产婷婷| 亚洲久久成人| 久久亚洲国产精品| 精品午夜国产福利观看| 波多野结衣在餐厅大战| 加勒比精品| 亚洲人妻无码一区二区| AV片在线观看| 亚洲国产精品VA在线看黑人| 伊人视频| 国产91白丝在一线播放| 日本精品久久久久久久久久| 久草在线草a免费线看| 国产美女高潮视频| 亚洲中文欧美| 少妇兰兰| 亚洲 图 欧洲 自拍 图片| 国产精品一区二区三区线一牛影视| 亚洲精品AV在线观看| 亚洲一区无码| AV天堂午夜精品一区二区三区 | 国产精品久久久久久影视| 亚洲二区无码| 开心五月婷婷| 337p日本欧洲亚洲大胆| 色色中文字幕| 无码一区无码二区| 国内精品伊人久久久久| 日本一区免费看| 国产无套精品久久久久久| 久久久无码精品成人A片小说| 亚洲 欧美 制服 另类 无码| 日韩欧美一级特黄大片| 免费无码不卡视频在线观看| 亚洲午夜精品A片久久W| 国产精品久久久久久久久久新婚| 亚洲精品久久久久58| 男人女人真曰批免费| 国产久热在线观看视频| 香蕉AV久久一区二区三区| 精品人妻一区二区三区1| 天天综合精品| wwwxxx日本| 爱草视频在线观看| 亚洲jav| 欧美日本不卡| 中文字幕一区二区三区日韩精品 | 国产激情久久久久| 日本欧美一区| 91无码精品一区| 中文字幕国产一区二区| 一道本高清无码| 每日av在线| 麻豆精品国产传媒AV| 91麻豆产精品久久久久久夏晴子| 国产又黄又爽又色的免费| 精品久久久久久无| 99热| 久久婷婷五月综合色丁香花| 久久成人在线| 暖暖 免费 高清 中文视频在线观看 | 最近2018中文字幕免费| 99热久久是有精品首页| 91AV观看| 精品一二区| 国产91网| 欧美精品一区三区| 一本本月无码-| 欧美激情999| 九九视频在线观看| 亚洲国产成人精品激情在线| 福利视频在线4| 国产亚洲欧美日本一二三本道| 好大好湿硬顶到了的好爽视频| 69人妻精品久久无人专区| 中国精品久久| 日韩视频在线观看| 不卡高清AV手机在线观看| 这里只有精品视频| 大屁股一区二区| 成人不卡在线| 91精品久久久老熟女九色91 | 精品久久久视频| 欧美日韩在线电影| 欧美自拍亚洲综合图区| 天天干天天综合| 亚洲AV无码精品蜜桃| 黑丝无码在线| 久久99精品久久久久久琪琪| 久久久无码人妻精品无码| 国产一精品一aⅴ一免费| 亚洲一级黄色| 精品一区二区三区无码AV久久| 99国产精品自拍| 色爱天堂| 69av一区二区三区| 大地资源网二在线观看完整版| 欧美性爱国产| 麻豆传媒网站免费进入| 99久久久无码国产精品性出奶| 精品成在人线AV无码免费看| 激情五月开心婷婷深爱| 三上悠亚AV高潮喷水无遮挡| 999久久国产精品免费人妻| 中文字幕永久| 久久精品婷婷| 四房播播色五月| 九九综合九九| 成全视频在线观看下载| 人妻乱| 日韩精品中文在线| 日本黄网| 亚洲黄色在线免费观看| 精品无码一区二区三区天香| 欧美性爱综合| 91精品国产综合久久久不打电影| 麻豆视传媒视频在线观看| 处一女一级a一片AV| 91在线日韩| 丁香园五月欧美久久| 99久久国产露脸人妻精品 | 色偷偷AV亚洲男人的天堂| 日韩一区二区免费电影| 91久久综合精品国产丝袜长腿 | 在线视频精品免费| av小说在线免费观看| 秋霞网| 欧洲lv尺码大精品久久久| 久久精品丝袜高跟鞋| 天堂成人网| 国产亚洲熟妇在线视频| 日韩电影免费在线| 亚洲国产中文字幕| 日韩在线国产| 精品国产精品一区二区夜夜嗨| 免费无码一区二区三区A片视频| 狠狠综合网| 亭亭色| 日韩一本在线| 精品AV亚洲乱码一区二区| 欧洲AV无码| 麻豆视频免费观看| 精品无码久久久久久国产←| 综合图片亚洲网友自拍10p| 在线不卡| 国产AV一区二区三区人妻| 午夜伦理视频| 老汉色av影院| 国产乱码在线观看| 快播看大黄| 丁香一区二区| 久久久久久久精| 亚洲AV成人一区二区三区不卡| 97免费线观看2018| 91在线人妻| 国产精品人妻久久久999| 在线xxxx| 久草在视频免费福利| 亚洲无码一区不卡| mdapptv麻豆下载| 久久国内免费视频| 91人妻人人澡| 在线观看黄页网站大全电影天堂| 国产av成人网站| 四虎影视永久无码精品| 亚洲AV激情无码专区在线播放| 99九九精品国产高清自在线 | 叼嘿视频| 欧美怡红院在线观看| 国产视频第二页| 亚洲视频免费看| 国产色婷婷精品综合在线观看| 亚洲免费av在线观看| 蜜桃网123| 日韩一区中文字幕| 国产suv精品一区| 欧洲av天堂| 国产午夜伦鲁鲁| 亚洲无码大片| 超频视频在线公开视频| 日韩人妻精品| 日韩激情视频无码| 777午夜福利理伦电影网| 毛片基地黄久久久久久天堂| 蜜桃视频在线观看免费网址入口 | 中文字幕精品久久久久人妻红杏1 亚洲日本欧美日韩中文字幕 | 大香蕉最新网址| 耽肉高H喷汁呻吟受攻| 久久久成人影院| 久久国语精品| 久久久久97| 日本天天躁天天搡久久| 天堂中文在线资源| 蜜桃一区二区三区| 日韩一区二区三区不卡| 日韩精品一区二区三区免费视频| 国产免费无码| 成全视频在线观看免费观看| 亚洲 欧美 日韩 在线| 久久99日韩| 麻豆影视在线直播视频| 天堂精品在线| 亚洲精品肉丝少妇在线| 成全高清大全的| 人人妻人人藻人人爽欧美一区| 起碰视频| 欧美日韩国产一区二区三区播放| 婷婷AV电影| 日韩欧美人妻少妇| 麻花豆剧国产MV在视频| 国产精品久久久久久久久久浪潮 | 无码国产精品一区二区高潮| 亚洲一区日韩| 日本东京熱A片| 色呦呦免费视频| 欧美人与禽性动交情| 麻豆文化传媒精品推荐| 亚洲乱小说| 91香蕉视频在线播放| 亚洲无码性爱| 日韩激情四射| 久久精品国产在热久久2019| 亚洲精品内射| 粉嫩av浪潮av蜜臀绯色av蜜桃| 色情久久久AV熟女人妻网站| 日韩中文AV| 猫咪aV大香蕉| 九九热久久只有精品2| 老子影院| 精品人妻久久久久| 久久精品国产亚洲AV麻豆| 国产精品无码一区| 国产香蕉一区二区三区| 1区2区| 最近更新中文字幕2019高清一页| 日本久热| 99爱视频| 大地影视资源中文官网| 国产精品女同| 秋霞一级片| 欧美视频不卡| 内射白嫩少妇超碰| 久久久噜噜噜WWW成人网 | 日本三级成人| 男女猛烈无遮掩视频免费软件| 精品亚洲Aⅴ无码一区二区三区| 免费黄色小说在线观看| 中文字乱码区2021| 久久久中文字幕| 99看片| 国产精品久久久久久人妻精品流| 青青草视频在线观看| 日本免费毛片| ww国产高清| 九九热这里只有国产精品| 久久久欧洲| 欧美精品久久久久久久久爆乳| 国精产品久拍自产在线网站 | 日本在线免费观看| 久久AV无码精品人妻系列老妇| 青青青国产在线观看手机免费| 无码av中文字幕久久专区| www.国产二区| 四虎影视永久无码精品| 麻豆文化传媒网站入口迎新年| 91欧美在线| 一区二区三区不卡在线| 青青草综合| av无码精品一区二区三区宅噜噜| 伦理在线视频| 国产精品99久久久| 亚洲ⅴ欧洲第一的日产gtr| 操你啦影院| 四虎永久免费| 亚洲九九精品| 黑人性爽XXXX性爽XYX| 无码日本大胆XXXX| 久久伊人精品| 亚洲AV日韩精品久久久久久久| 日韩成人三级| 亚洲乱码一区二区三| 蜜桃AV亚洲第一区二区| 少妇一级淫片免费看| 家庭乱伦 - 草泥马视频| 九一精品国产| 丁香色情五月综合网站| 777午夜福利理论电影网| 91福利视频网站| 国产精品白嫩无码AV在线观看| 暖暖视频在线观看免费国语| 无码丰满少妇2在线观看| 亚洲一区天堂| 国产成人久久精品| 在线视频久久只有精| 婷婷爱| 亚洲一二三四视频| 国产成人啪精品| 国产超碰自拍| 日本亚洲欧洲另类图片| 伊人大蕉久在线播放| 蜜桃成人无码区免费视频网站| 久久久久久999| 亚洲v国产v| 又色又爽又黄的A片免费看苍井空| 国产熟女av| 亚洲按摩| 国产精品传媒在线观看| 青草影院内射中出高潮| 人人澡超碰碰97碰碰碰| 无码人妻一区二区三区在线| 人人妻人人藻人人爽欧美一区| 久久丫精品| www.精品久久| 性做久久久久久蜜桃花| 麻花传媒剧国产MV入口在线观看| 人人插人人干| 国产igao| 91av网址| 男人天堂视频在线| 美女黄频在线观看| 国产人妻人伦精品一区二区| 香蕉鱼视频观看在线视频下载 | 九九热线有精品视频86| 久久囯产精品99蜜桃传媒| 国产精品无码一区二区在线播放| 手机不卡av| 麻豆AV传媒在线播放免费观看 | 人禽伦交短篇小说| 国产日韩精品视频| 日韩午夜理论| 婷婷色婷婷| 99re在线播放视频| 四平青年第二部完整版| 放荡的少妇2欧美版| 人人澡人人爽| 欧美黄色精品| 久久精品噜噜噜成人88Aⅴ| 第九色激情| 精品国产一区二区三区四| 中文无码日本一级A片久久影视| 亚洲精品五月天| 在线中文在线| 国产美女自卫慰视频福利| 人妻av无码一区二区三区| 欧美一级特黄A| 国产精品va无码一区二区三区在线| 伊人久久精品AV无码一区| 亚洲性无码AV久久成人| 色啦啦| 在线中文无码| 日韩一本在线| 夜夜爽夜夜| 视频一区二区国产| 日韩毛片免费| 欧美三级台湾三级少妇| 风韵少妇性饥渴私密推油| 日本精品成人无码中文字幕网址| 葵千惠无码人妻一区二区| 啪啪导航| 亚洲 日本 欧美 中文字幕| md传媒免费观看在线播放| 成人高清无码| 熟妇网站| 国产尤物在线视频| 婷婷四色| 激情无码人妻| 岛国高清无码| 亚州AV在线观看| 极品丝袜美女一区| 欧美a∨亚洲欧美亚洲| 人妻黑人ntr黑人社长的超激| 国产亚洲精品精华液| 91在线丨porny丨国产| 国产精品探花熟女AV| 911精产品一区一区三区| 亚洲码专区| 粉色视频午夜网站入口| 九九久久久久| 青青操91| 天堂视频免费在线观看| 激情五月开心婷婷深爱| 亚洲乱码AV中文一区二区| 无码乱人伦一区二区亚洲| 大地资源影视中文二页| 大地影院大全在线观看| 五月天激情综合网| 校园春色性| 欧美日本道免费一区二区三区 | 日本一区二区久久| 奇米网一区二区| 国产+高潮+白浆+无码| 少妇被躁爽到高潮无码人狍大战| 五月天少妇| 国产内射一区| 中文字幕在线观看网站| 性色在线| 国产一二三四五区| 先锋影音AV资源站| 午夜精品久久久久久久久久久久| 精品少妇久久久久久888优播| 精品无码久久久久久国产| 亚洲无码中文AV| 久久激情电影| 香蕉久久综合网| 国产精品无码久久久久久久密臀| 欧美熟妇精品| 中文无码专区| 蜜桃视频污| 国产欧美日韩在线观看| 成人伊人| 久久黄色免费| 久久这里只有精品1| 五月四房| 91av视频| 97人视频国产在线观看| 久久骚| 淫荡人妻在线视频| 无码特级毛片免费视频| 第九色激情| 日韩av色色| 久久国产日韩| 日韩综合网| 人妻体内射精一区二区| 午夜时刻免费实验区观看| 久久久久久久国产免费看| 大地影院大全在线观看| 欧美99视频| 麻豆AV导航| 人妻少妇-nc18嫩草| 免费69国产精品成人无码视频| 无码 一区二区| 亚洲成人不卡| 亚洲av美女| 国产精品熟妇人妻g奶一区| 97色在线| 国产一级无码毛片| 麻豆精品视频在线| 国产超碰在线| 大地资源中文字幕第8页| 成全大全免费观看完整版高清下载 | 黄色成人无码| 久久久夜色精品| 亚洲精品熟女| 伊人蕉久75影院在线播放| 色欲久久精品AV无码| md豆传媒| 天堂草原影院电视剧在线天津| 日本一区免费更新不卡| 亚洲在线观看av| 国产一区二区不卡在线| 中文字幕无码精品| 亚洲一区内射后入| 亚洲精品国产精品国自产观看| 久久久久97国产| 国内精品久久久久久| 久久视频这里都精品| 午夜福到在线2019| 粉嫩AV一区二区三区四区在线不卡| 台湾人妻偷人三级| 国产欧美视频在线播放| 亚洲精品69| 亚洲 激情 小说 另类 欧美| 中文字幕无码av| 日韩一区二区三区中文字幕| 无码人妻久久一区二区三区不卡| 脱她衣服揉她奶小视频| 怡红院在线视频成年视频| 99er久久国产精品在线| 亚洲精品福利在线| 伊人综合视频| 成人H动漫精品一区二区无码软件| 在线视频日韩| 亚洲处破女A片出血疼| 国产精品人妻熟女a8198v久| 少妇三级全黄| 亚洲AV少妇一区二区在线观看| 欧日韩一区二区| 色老头影院| porn在线视频一区二区| 国产色情麻豆一区二区乐视| 国产精品国产高清国产| 无码人妻一区二区三区四区| 无码人妻av一区二区| 亚洲日本久久久| 动漫女扒开腿爆乳无遮挡GIF| 日韩精品AV一区二区三区| 日韩日日操| 少妇一区精品久久麻豆| 免费看黄的视频| 国产91精品看黄网站在线观看| 欧美日韩国产精品| 麻豆传煤网站APP入口直接进入| 麻豆COMCN| 无码免费看| 免费无码av片在线观看| 拔擦拔擦8X永久华人免费播放器| 粉色视频午夜网站入口| 蜜桃AV噜噜一区二区三区四区五区| 国模吧一区二区三区| 久久久毛片| 天天在线视频观看视频| 日韩有码一区二区三区| 麻豆传媒免费在线观看| 欧美国产精品一区| 在线观看网址入口2020| 办公室扒开奶罩揉吮奶头A片久久| 国产一区二区三区四区精品AV| 日本不卡一二区| 国产精品666| 熟妇人妻无码XXX视频| 桃花社区视频在线播放| 成人香蕉视频在线观看| 欧美精品HD| 青青草成人网站| 中语日产乱码视频在线看| 国产视频不卡| 新搬来的白领女邻居| 精品爆乳一区二区三区无码AV| 在线视频网站| 无码福利在线| 字幕网av| 西西人体大胆4444w w| 国产精品毛片一区视频播| mdapptv麻豆下载| 天天干天天操天天做| 91 色| 99思思久热在线视频| 久久视频这里有精品63| 91精品丝袜久久久久久| 日韩无码一区二区三| 亚洲熟女乱伦| 最近中文字幕高清字幕免费MV| 狂操极品美女| 日韩黄色电影免费观看| 一区二区三区欧美| 黄色香蕉视频网站| 国产乱淫片视频| 欧美XXXX×黑人性爽| xxx久久久| 五月综合视频| 天天日天天干天天添| 少妇激情综合| 色窝视频| 欧美性爱综合| 国产一卡2卡三卡4卡免费网站 | 四虎影视永久无码精品| 国产精品国产三级国产专播IOS| 色欲天天综合| 99久久人妻无码精品系列蜜桃| 狠狠躁夜夜躁人人爽天天高潮| 最近最好看的2018中文字幕国语| 五月在线视频| JAPANESEHD熟女熟妇伦| 麻豆传煤网站APP入口直接进入在线最新版| 欧美性生交XXXXX无码HD| 日韩人妻一区二区三区四区| 亚洲国产无码一区二区| 本道综合精品| 2017国产小视频| 精品国产AV一区二区| 久久久久噜噜噜亚洲熟女综合| 欧美xxxx性喷潮| 国产无码| 青青草原在线视频| wwwav在线| 欧美激情伊人| 成人乱码一区二区三区AV | 最好看的2018中文中国国语| 中文字幕视频二区| 国产另类综合| 亚洲精品无码AV一区二区| 日韩无码一道v| 国产无码黄片| 91麻豆产精品久久久久久夏晴子| 婷婷情色| 亚洲欧洲日本综合在线| 狠狠做深爱婷婷久久综合一区| 图片区 亚洲 在线视频| 色情欧美一区二区久久夜爽| 欧美 日韩 人妻| 日韩人妻鲁交色情精品视频| 黄色小说在线免费看| 黄色AV三级| 国产无套精品一区二区三区| 91久久人澡人人添人人爽| 五十路大垂乳熟妇| 日本成人一区二区三区| 亚洲一区日韩精品| 久热精品视频| 久久久999国产精品| 六月伊人| 丁香婷婷综合激情五月色| 欧美激情图| 亚洲黄色网址| 日本一区二区在线免费| 夜夜欢天天干| AV天堂午夜精品一区二区三区| 超碰在线观看91| 91在线日本| 色偷偷综合| 激情五月丁香婷婷| 加勒比色色| 亚洲va国产va天堂va久久| 亚洲国产精品99久久| 丁香大型成人网| 日本黄色日逼视频| 久久无码av高潮av喷吹捆绑| 国产精品久久久无码一区二区三区| 少妇喷水视频| 91久久精品无码| 国产亚洲无码精品| 亚洲免费高清无码| 国产欧美乱伦| 色翁荡熄又大又硬又粗又视频| 亚洲AV无码一区二区乱| 丁香五月天的最新地址| 婷婷丁香五月社区亚洲| 美女无套进入18p| 亚洲综合91| 久久av电影| 91AV久久| 午夜福利片| 色欲AV亚洲精品一区二区| 日韩黄片一区二区| 亚洲99精品A片久久久久久| 大香蕉97| 九九在线精品视频xxx| 天天日日操| 亚洲综合AV色婷婷五月蜜臀| 亚洲国产精品vA在线| 在线成人精品国产区免费| 午夜免费试看| 暖暖 免费 视频 在线 视频| 18禁www| 五月色播影音先锋| 国产99色| 老湿免费48福利体检区| 欧美一区2区三区4区公司| 2019年手机中文字幕| 久久嫩草国产成人一区| 成人久久| 香蕉精品视频在线| 亚洲九九| 无码探花| 久久国产电影| 三级黄色免费| 欧美乱码卡一卡二卡四卡免费| 免费看麻豆视频| 欧洲洲一区二区精华液| 日产高清无码| 麻豆视传媒官方网站入口武汉 | 97在线中文字幕观看视频| 日韩一二三区在线观看| 日本中文字幕在线| 美女看片| 午夜精品久久久久久影视riav| 国产真人毛片| 新新电影 影音先锋| 精品91久久久久久| 日韩在线免费观看视频| 91精品国产欧美一区二区| 忘忧草视频在线播放免费观看| 欧美爱爱网址| 久久99AV无色码人妻蜜桃| 久久久久久无码精品人妻一区二区| 午夜影院顶级大片| 国产精品揄拍一区二区| 美女视频网站免费| 亚洲综合激情| 欧美日韩毛片| 亚洲男神官网| 国产av资源| 91性爱小视频| 久久性视频| 91久久久久久久久久久久久| 国产色婷婷精品综合在线观看| 国产黄色电影一区| 大地资源影视中文官网入口| 国产自慰在线| 久久黄色精品视频| 香蕉在线精品视频在线| 久久久久九九九| 精品一二三区久久AAA片| 国产剧情久久| 少妇精品视频一区二区| 综合五月天| 大屁股91精品| 中文无码乱人伦中文视频播放| 欧美成人精品H| 丁香五月综合缴情电影| 日韩中文一区二区三区| 亚洲欧美日韩成人在线| 9191在线| 午夜三级| 亚洲免费电影| 韩日在线| 国产精品久久久久66| 天堂草原影院电视剧在线| 国内精品久久久久| 山东菏泽气温| 暖暖 视频 免费 高清 日本在线观看 | www.久久久久久久久| 538在线观视频免费观看| 亚洲精品久久久蜜桃| 91无码一区| 8男三女交换4P| 国内乱伦视频| 欧洲洲一区二区精华液| 老妇a老妇女大黑毛| 五月综合视频| 色婷五月| 依依影院| 麻豆一区二区免费播放网站| 17c.com一起草久久久网站| 国产精品最新| 538prom精品视频我们不只是| 亚洲精品色| 午夜无码熟熟妇丰满人妻视频| 日产一线二线三线哺乳 | 亚洲av网站在线观看| 午夜成人A片精品视频免费观看| 久久婷婷精品| 一个色导航网站| 国产又爽又黄无码无遮挡在线观看| 久久国产乱子| A片无码午夜久久久涩涩| 国产内射一区| 国产一区二区精品欧美| 久久国产亚洲精品AV麻豆| 无码天堂网| 性欧美videos高清hd4k| 加勒比东京热无码中文| 中文字幕首页| 在线无码高清| 婷婷开心情五月色在线| 四季AV一区二区凹凸懂色| 日韩黄色电影免费看| 69福利视频| 日日噜噜夜夜爽爽| 国产伦理在线| MD豆传媒APP网址入口免费| JLZZJLZZJLZZ| 激情 小说 图片 亚洲 伦| 最近2018中文字幕免费| 国产av成人网站| 无码加勒比| 中国女人内射6XXXXX| chinese国产| 99精品国产一区二区三区麻豆| 在线欧美一区| 四虎w z| 亚洲视频1区| 亚洲婷婷在线| 久久精品AV麻豆| 亚洲人妻丝袜| 亚洲精品一区二区三区四区五区六区| 国产精成人品| 欧美野战| 日韩精品一区二区三区AV在线观看| 2012中文字幕视频大全| 人妻无码中文字幕| 国产免费久久久999999| 久久视频在线视频观看99| 人妻少妇网站| 久久一精品| 懂色av成人一区二区| 亚洲精品国偷拍自产在线| 男女交性视频免费播放视频| AV网站亚洲| 麻豆国产免费| 久久久99精品免费观看| free性饿老太xxhd| 日韩午夜三级| 婷婷爱五月| 欧美丰满熟妇BBB久久久| 亚洲激情精品| 在线观看h| 2020午夜福利| 中文字日产幕码三区做法| 91精品国产免费久久久久久| 欧美国产日韩精品| 久久精品国产亚洲av片多多| 国产精品十八禁| 538在线在视观看视频| 日本精品一区| 中文字幕 丝袜 日韩 另类| 欧美性生活一区二区| 在线观看网址入口2020| 高清无码一二三区| 国产精品第| 色午夜福利| 99视频69e精品视频| 人妻影院| 精品一区二区三区久久久| 国产精品自在自线| 国产一区二区三区精华| 极品美鲍一线天| 日躁夜躁狠狠躁2001| 国产熟女高潮精品视频| 一区在线免费观看| 日韩一级片在线| 日韩码一码二码三码区别69| 黄色四虎影院| 国产亚洲欧美精品久久久久久| 国产1988精品A片| 久久久久久免费毛片| 国产毛片精品国产一区二区三区| 日本无码第一页| 99精品国产免费久久久久久下载| 麻豆传煤官网APP免费入口| 日本xxxx人| 人人插人人爱| 欧美黑大粗aaaaa级在线特区| 粉嫩av一区二区| 狼群视频资源在线观看| 国产二三四区| 亚洲AV最新在线网址| 亚洲综合另类图片| 中文字幕AV久久一区二区| 2020亚洲 欧美 国产 日韩| 久久国产精品免费| 欧美一区二区人人喊爽| 麻豆精品在线| 国产色图视频| 天堂草原电视剧在线高清图片| 开心四房播播| 亚洲中文无码成人影院| 久久AAAA片一区二区| 欧州毛片| 丰满少妇弄高潮了www| 无码人妻丰满熟妇A片护士M| 豆奶app下载汅api免费下载ios| 久久99视频| AV大片免费看| 亚洲wwww| 日韩极品在线| 亚洲操| 大地资源第二页中文高清版| 国产 欧美 亚洲 中文字幕| 伊人久久精品| 97成人网站| 精品孕妇一区二区三区| 国产精品久久久99| 谁是你的菜3| 亚洲天堂99| 亚洲女人被黑人巨大的原因| 精品人妻码一区二区三区| 91九色精品| 欧美狠狠爱| 亚洲激情影院| 亚洲AV久久久精品麻豆| 大地影视资源中文第二页| 国产超碰AV人人做人人爽| 日韩一区二区三区无码A片| 国产精品无码二区| 不卡欧美| 岛国av一区二区| 五月天成人影院| 少妇特黄A片一区二区三区免费看 成人亚洲A片V一区二区中出片 | 日本一二三不卡视频| 大香蕉8| 在线 国产 欧美 专区| 成人午夜A片产无码免费视频日本| 久久综合综合久久| 国产精品久久久久三级| 成人网站国产| 99热综合| 亚洲精品视频观看| 亚洲狼友视频| 69日本xxxxxxxx96| 大地影视资源官网入口| 麻豆免费国产福利视频| 亚洲精品久久久久秋霞| 久久人人人| 亚洲欧美日韩色图| 久久一久久| 国产精品男人的天堂| 五月天开心激情| 国产暴力强伦轩1区二区动漫 | 大地资源中文二页在线观看| 国模大胆一区二区三区| 久久久久亚洲AV成人无码电影| 欧美二级黄片| 久久久久9| 天天插天天射天天干| 欧美一级特黄大片做受| 亚洲+变态+欧美+另类+精品| 97视频免费| 国产精品人妻一区二区99| 九九热在线免费| 中文字幕 制服 亚洲 另类 | 大地影视中文资源官方网站| 日韩无码第二页| 国产自慰在线| 亚洲日日夜夜| 日本一区高清视频| 成人精品视频一区| 尹人大香蕉| 久久人妻久久| 黑人玩弄人妻一区二区三区| 午夜片欧美伦+欧美大片| 亚洲AV久久久精品麻豆| 国产AV国片精品一区二区| 亚洲欧美精品在线| 国产精品久久久久久久曹县翰林府 | 外国日逼视频| 好看的久久不射无码影视| 国产性爱一区二区三区| 99久久精品午夜一区二区三区| 人操人人人操| 中文字幕在线视频不卡| 偷拍综合| 国精品无码人妻| 骚逼被干| 久久国产精品区| 深爱激情五月婷婷| 91视频88av| 国产人妻14p| 少妇无套内谢太紧了视频| 丁香六月激情综合| 大地资源高清在线观看| CHINESE勾搭少妇VIDEOS| 小草在线观看中文字幕| 免费啪视频观试看视频感受| 媒豆传媒免费视频入口网站 | 亚洲香蕉视频| 亚洲视频日本有码中文| 一本到2v不卡区| 邻居穿透明内衣在线观看| 亚洲伊人成色综合网| 少妇人妻好深太紧了A片乚 | 一本无码高清| 国产无码一二区| 久久久久久久久久毛片| 青青草视频在线观看| 亚洲日本国产| 久久黄视频| 7m福利导福航第一站| 邻居穿透明内衣在线观看| 麻豆视传媒短视频免费官网| 麻豆TV入口在线看| 最近免费高清观看MV| 高潮喷水无码AV亚洲| 久久AV国产麻豆HD真实乱| 蜜桃视频成人A片免费观看| 伊人影院香蕉久在线26| 亚洲精品美女偷拍一区二| 亚洲一区在线日韩在线深爱| 国产AV国片精品一区二区| 久草操| 久久久久久国产视频| 国产精品久久久久久久专区| 国产午夜Av无码无久久| 97免费在线| 激情久久网| 性爱视频一区二区| 国产精品一区二区三区在线| 国产无遮挡又黄又爽在线观看| 亚洲一级av无码毛片精品| 亚洲AV无码精品色午夜果冻不卡| 久久久久无码精品| 91久久久久久久| 亚洲福利一区| 国产麻豆MD传媒视频| 色情久久久AV熟女人妻网站 | 欧美高清性xxxxhd| 久久Av一区二区三区杨思敏| 人妻av无码一区二区三区| 日韩精品一二三区| 久久久久久久免费| 国产精品一国产AV麻豆| 日产精品码2码三码四码区别 | v片在线观看| AV片在线观看| 亚洲 日韩 中文 制服| 97人妻久久久精品系列A片| 国产AV一区二区三区人妻| 久草在视频免费福利| 中文字幕精品AV一区二区五区| 97最新网址| 国产一级久久久久毛片精品| 成人网站日韩| 超级碰碰碰| Av小说免费在线观看| 亚洲精品国产精品乱码| 欧美午夜精品久久久久久浪潮| 欧美日韩亚洲激情| 麻豆视传媒官方网站入口在线| 久草热久草在线视频| 大地资源影视中文官网入口| md豆传媒app地址入口免费看 | 天天射天天日天天干| 色婷婷基地| 91久久久久久| 99久久人妻无码精品系列蜜桃| 伊人久久大香线蕉无码麻豆| 2020精品卡1卡2卡三卡| caoporn超碰 在线观看| 99久久人妻精品免费一区二区| 性欧美videosex高清少妇| 久久人人妻性色av| 色一情一伦一子一伦一区| 在公车上拨开内裤进入毛片在线看| 99视频这里只有精品20| 久久丫线这里只精品| 日本夜爽爽一区二区三区| 欧美熟妇内谢96XXXXX| 色偷av| 日韩精品导航| 国产又滑又嫩又白| 亚洲A片成人无码久久精品色欲 | 久久久久国产精品嫩草影院| 粉色app福引导| 大地影视中文资源官网| 99视频网站| 一区二区三区免费精品| 人人妻人人澡人澡人人精品少妇 | 91在线无码| 少妇真人| 天天干天天操天天干| 欧美中文日韩| 黄区1区2区3区4区5区| 播五月色五月开心五月网| 亚洲日本一区二区一本一道| 国产精品人人妻人人爽人人牛| 三级片在线一区| 超碰av在线| 野花社区免费资源在线观看| 麻豆传煤传媒网址在线观看 | 蜜桃久久久久久| 国产精品国产三级国产aⅴ原创| 精品久久久久久久久久久国产字幕| 暖暖 免费 高清 日本视频下载| 麻豆蜜传媒| 精品91久久久久久| 六月激情网| 久久久新| 老鸭窝LAOYAWO永久地址2019| 国产精品久久久久久影视| 久久久久久视| 国产亚洲精品久久久久久打不开| 成人久久| 暖暖 免费 高清 中文视频在线观看| 亚洲精品国偷拍自产在线观看蜜桃| 国产在线毛片| www.久草.com| 99国产精品丝袜久久久久| 成人A片一区二区三区在线观看 | 樱花影院| 日韩无码专区| 桃色bt| 欧美日韩无码专区| 国产91xxx| 人妻无码久久久| 一区二区三区日韩欧美| 国产强奷糟蹋漂亮邻居在线观看| 开心五月 激情五月 深爱五月| 欧美色图片区| 亚洲AV无码区国产| 九九热九九| 久久66热人妻偷产国产| 精品免费一区二区三区四区| 欧美激情一区二区三级高清视频| 高清无码小视频| 午夜性啪啪A片免费AAA毛片| 国产AV电影区二区三区曰曰骚网| 久久伊人草| 久久精品系列| 日韩一级大片| 精品水蜜桃久久久久久久| 高潮一区二区| 日韩AV线上| 亚洲无码二区| 老司机给个网站2021| 蜜桃视频一区二区三区| 国产毛片精品国产一区二区三区| www.四虎.com|